[1]张 杰,王 斌,杨 涛,等.韩家湾煤矿浅埋近距房柱式采空区下开采动载研究[J].西安科技大学学报,2017,(06):801-806.[doi:10.13800/j.cnki.xakjdxxb.2017.0606 ]
 ZHANG Jie,WANG Bin,YANG Tao,et al.Strong strata behavior in the shallow and close distance coal seam beneath room-and-pillar mining goaf[J].Journal of Xi'an University of Science and Technology,2017,(06):801-806.[doi:10.13800/j.cnki.xakjdxxb.2017.0606 ]
点击复制

韩家湾煤矿浅埋近距房柱式采空区下开采动载研究(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2017年06期
页码:
801-806
栏目:
出版日期:
2017-11-30

文章信息/Info

Title:
Strong strata behavior in the shallow and close distance coal seam beneath room-and-pillar mining goaf
文章编号:
1672-9315(2017)06-0801-06
作者:
张 杰12王 斌12杨 涛12刘 东12刘效贤3
1.西安科技大学 能源学院,陕西 西安 7110054; 2.教育部 西部矿井开采及灾害防治重点实验室,陕西 西安 710054; 3.陕西煤业化工集团有限责任公司 韩城矿业有限公司,陕西 渭南 715400
Author(s):
ZHANG Jie12WANG Bin12YANG Tao12LIU Dong12LIU Xiao-xian3
(1.College of Energy Science and Engineering,Xi'an University of Science and Technology,Xi'an 710054,China; 2.Key Laboratory of Western Mine Exploration and Hazard Prevention,Ministry of Education,Xi'an 710054,China; 3.Hancheng Mining Co.,Ltd.,Shaanxi Coal and Chemical Industry Group Co.,Ltd.,Weinan 715400,China)
关键词:
浅埋近距煤层 房柱式采空区 区段煤柱 动载矿压
Keywords:
shallow close distance seam room-and-pillar mining goaf section coal pillar strong strata behavior
分类号:
TD 32
DOI:
10.13800/j.cnki.xakjdxxb.2017.0606
文献标志码:
A
摘要:
为研究韩家湾煤矿浅埋近距房柱式采空区及煤柱下开采的动载矿压,运用理论分析方法和物理相似模拟实验,采用应力和位移的监测手段,对综采工作面过房柱式采空区及煤柱进行模拟研究。研究表明,房柱式采空区下,工作面覆岩会随着下煤层关键层的破断而依次破坏,矿压显现较一般浅埋煤层开采剧烈,但未发生动载。而在进入区段煤柱期间,工作面只表现出比单一煤层开采时工作面压力较大,在出煤柱时则普遍存在动载矿压现象,动载易发区域在煤柱中的最后一次周期来压后10 m范围内。研究成果在韩家湾煤矿2405工作面进行了动载预测和防治。
Abstract:
In order to study the strong strata behavior of exploitation beneathcoal pillars and room-and-pillar mining goaf in shallow and close distance seam of Hanjiawan coal mine,the physical simulation experiment and theoretical analysis were applied,and the method of stress and displacement was adopted to simulate the process of fully-mechanized working face through a room-and-pillar mining goaf and coal pillars.The research shows that the overburden strata of working face beneath the room-and-pillar mining goaf will rupture in turn with the breaking of key strata,and the strata behavior is more severe than general shallow seam but without dynamic loads.During mining face moving into the section coal pillar,the strata behavior is just more severe than a single coal seam.The phenomenon of strong strata behavior commonly exists when mining face is out of coal pillar,and strong strata behavior region is within 10 meters after the last periodic weighting.The study results have been applied to forecast and control strong strata behavior in No.2405 working face of Hanjiawan coal mine.

参考文献/References:

[1] 黄庆享.浅埋煤层长壁开采顶板结构及岩层控制研究[M].徐州:中国矿业大学出版社,2000. HUANG Qing-xiang.Study on roof structrue and ground control in shallow seam longwall mining[M].Xuzhou:China University of Mining and Technology Press,2000.
[2] 黄庆享.浅埋煤层的矿压特征与浅埋煤层定义[J].岩石力学与工程学报,2002,21(8):1 174-1 177. HUANG Qing-xiang.Ground pressure behavior and definition of shallow seams[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(8):1 174-1 177.
[3] 黄庆享,杜君武,刘寅超.浅埋煤层群工作面合理区段煤柱留设研究[J].西安科技大学学报,2016,36(1):19-23. HUANG Qing-xiang,DU Jun-wu,LIU Yin-chao.Study on section coal pillar of group mining in shallow buried coal seams[J].Journal of Xi'an University of Science and Technology,2016,36(1):19-23.
[4] 鞠金峰,许家林.浅埋近距离煤层出煤柱开采压架防治对策[J].采矿与安全工程学报,2013,30(3):323-330. JU Jin-feng,XU Jia-lin.Prevention measures for support crushing while mining out the upper coal pillar in close distance shallow seams[J].Journal of Mining and Safety Engineering,2013,30(3):323-330.
[5] 商晶志,付兴玉,李凤明,等.房式采空区集中煤柱下动载矿压灾害防治技术[J].煤矿开采.2016,21(3):112-116. SHANG Jing-zhi,FU Xing-yu,LI Feng-ming,et al.Disaster prevention of dynamic loading mine pressure under central coal pillar with room goaf[J].Coal Mining Technology,2016,21(3):112-116.
[6] 肖剑儒,李少刚,张 彬,等.浅埋深煤层房采区下综采工作面动压控制技术[J].煤炭科学技术,2014,42(10):20-23. XIAO Jian-ru,LI Shao-gang,ZHANG Bin,et al.Control technology of dynamic mine strate pressure of fully-mechanized coal mining face under gob left by room and pillar mining of shallow depth seam[J].Coal Science and Technology,2014,42(10):20-23.
[7] 鞠金峰,许家林.倾向煤柱边界超前失稳对工作面出煤柱动载矿压的影响[J].煤炭学报,2012,37(7):1 080-1 087. JU Jin-feng,XU Jia-lin.Influence of leading instability in the upper dip coal pillar boundary to the strong strata behaviors during the working face out of the pillar[J].Journal of China Coal Society,2012,37(7):1 080-1 087.
[8] 周海丰.综采工作面过上覆集中煤柱压架机理分析[J].煤炭科学技术,2014,42(7):120-123,128. ZHOU Hai-feng.Analysis on hydraulic support crushed mechanism when fully-mechannized coal mining face passed through concentrated coal pillar area in above seam[J].Coal Science and Technology,2014,42(7):120-123,128.
[9] 鞠金峰,许家林,朱卫兵,等.大柳塔煤矿22103综采面压架机理及防治技术[J].煤炭科学技术,2012,40(2):4-7. JU Jin-feng,XU Jia-lin,ZHU Wei-bing,et al.Hydraulic powered support jammed mechanism and prevention technology of fully mechanized coal mining face in Daliuta mine[J].Coal Science and Technology,2012,40(2):4-7.
[10]肖剑儒.神东矿区房采采空区下综采工作面动载矿压防治技术[J].中国矿业,2016,25(3); 76-80. XIAO Jian-ru.The control technology of dynamic mine strate pressure of full-mechanized mining face under gob left by room and pillar mining in Shendong mining area[J].China Mining Magazine,2016,25(3); 76-80.
[11]ZHU Wei-bing,XU Jia-lin,KONG Xiang,et al.Study on pillar stability of wongawilli mining area in shallow close distance coal seams[J].Procedia Earth and Planetary Science,2009,1(1):235-242.
[12]李浩荡,杨汉宏,张 斌,等.浅埋房式采空区集中煤柱下综采动载控制研究[J].煤炭学报,2015,40(S1):6-11. LI Hao-dang,YANG Han-hong,ZHANG Bin et al.Control study of strong strata behaviors during the fully mechanized working face out of concentrated coal pillar in a shallow depth seam in proximity beneath a room mining goaf[J].Journal of China Coal Society,2015,40(S1):6-11.
[13]陈苏社.综采工作面过上层煤集中煤柱动载矿压控制技术[J].煤炭科学技术,2014,42(6):140-143. CHEN Su-she.Dynamic mine strata pressure control technology of fully-mechanized coal mining face passing through concentrated coal pillars in above seam[J].Coal Science and Technology,2014,42(6):140-143.
[14]杨俊哲.浅埋近距离煤层过上覆采空区及煤柱动压防治技术[J].煤炭科学技术,2015,43(6):9-13. YANG Jun-zhe.Dynamic pressure prevention and control technology of coal mining face with shallow depth and contiguous seams passing through overburden goaf and coal pillars[J].Coal Science and Technology,2015,43(6):9-13.
[15]鞠金峰,许家林,朱卫兵,等.近距离煤层工作面出倾向煤柱动载矿压机理研究[J].煤炭学报,2010,35(1):15-20. JU Jin-feng,XU Jia-lin,ZHU Wei-bing,et al.Mechanism of strong strata behaviors during the working face out of the upper dip coal pillar in contiguous seams[J].Journal of China Coal Society,2010,35(1):15-20.
[16]李鸿昌.矿山压力的相似模拟试验[M].徐州:中国矿业大学出版社,1998. LI Hong-chang.The similar simulation testing of ground pressure[M].Xuzhou:China University of Mining and Technology Press,1998.
[17]崔希民,缪协兴,苏德国,等.岩层与地表相似材料模拟试验的误差分析[J].岩石力学与工程学报,2002,21(12):1 827-1 830. CUI Xi-min,MIU Xie-xing,SU De-guo,et al.Error analysis in similar material simulation test of the movement of rock strata and surface[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(12):1 827-1 830.
[18]钱鸣高,石平五,许家林.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2010. QIAN Ming-gao,SHI Ping-wu,XU Jia-lin.Ground pressure and strata control[M].Xuzhou:China University of Mining and Technology Press,2010.
[19]李铁汉,潘别桐.岩体力学[M].北京:地质出版社,1980. LI Tie-han,PAN Bie-tong.Rockmass mechanics[M].Beijing:Geological Publishing House,1980.

备注/Memo

备注/Memo:
收稿日期:2017-01-04 责任编辑:杨泉林
基金项目:国家自然科学基金项目(51474173,517742229)
通讯作者:张 杰(1978-),男,四川达县人,博士,教授,E-mail:zhangjie655@163.com
更新日期/Last Update: 2017-12-11