[1]吕文宏.覆岩顶板导水裂隙带发育高度模拟与实测[J].西安科技大学学报,2014,(03):309-313.
 LV Wen-hong.Measure and simulation for developmentheight of water conducted crack zone in overburden roof[J].Journal of Xi'an University of Science and Technology,2014,(03):309-313.
点击复制

覆岩顶板导水裂隙带发育高度模拟与实测(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2014年03期
页码:
309-313
栏目:
出版日期:
2014-06-30

文章信息/Info

Title:
Measure and simulation for developmentheight of water conducted crack zone in overburden roof
文章编号:
1672-9315(2014)03-0309-05
作者:
吕文宏
陕西中能煤田有限公司,陕西 榆林 719000
Author(s):
LV Wen-hong
Shaanxi Zhongneng Coalfield Co., Ltd.,Yulin 719000,China
关键词:
综采工作面 导水裂隙带发育高度 数值模拟
Keywords:
fully mechanized mining face development height of water conducted crack zone numerical simulation
分类号:
TD 823.8
文献标志码:
A
摘要:
文中主要研究榆阳煤矿延安组3#煤层覆岩导水裂隙带发育高度等问题,为矿井防治水和保水采煤提供设计依据。以2304综采面为工程背景,应用UDEC数值软件模拟计算了覆岩冒落带及导水裂隙带高度,并在采空区钻探和试验。研究表明:依据《建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程》(以下简称《规程》)计算所得导水裂隙带最大高度为32.4~43.6 m.数值模拟冒落带和裂隙带高度分别为16和86 m.现场钻探、试验实测冒落带高度介于14.2~17.2 m,导水裂隙带发育高度介于84.8~96.3 m.导水裂隙带高度明显大于按《规程》计算得到的数值,经验计算在解决榆阳煤矿导水裂隙带高度时存在一定的局限性和区域性,而数值模拟的冒落带高度和导水裂隙带发育高度得到了现场实测结果的验证,两者结果基本吻合。综合结果所得:2304综采面覆岩冒落带最大高度为17.2 m,导水裂隙带最大发育高度为96.3 m.
Abstract:
This paper studies the development height of water flowing fractured zone forYuyang Yan'an group 3# Mine Overburden,providing the basis for the design of prevention and treatment of mine water and coal mining under water.Mechanized mining face in 2304 as engineering background,application of numerical software UDEC to simulation of the overlying rock caving zone and the height of water flowing fractured zone,and drilling and testing in the mined area.Studies have shown that:based on “buildings,water,rail and roadway main pillar for the Coal Mining Regulations”(hereinafter referred to as the “Regulations”),calculated water flowing fractured with a maximum height of 32.4~43.6 m.Numerical simulation of caving zone and fractured zone height 16 and 86 m,respectively On-site drilling,test measured the height of the caving zone between 14.2~17.2 m,height of water flowing fractured zone developed between 84.8~96.3 m.Water flowing fractured zone height was significantly greater than the calculated values, and experience is of calculation some limitations in solving regional and Yuyang coal mine water flowing fractured zone height,and numerical simulated caving height and water flowing fractured zone with a highly developed field test results have been verified,the two results are basically consistent.Consolidated results obtained the maximum height of 2304 mechanized mining face overlying rock caving zone is 17.2 m, and the largestgrowth heightofwater flowing fractured zone is 96.3 m.

参考文献/References:

[1] 李常文,汪 锐,何孜孜,等.高头窑煤矿河下开采导水裂隙带高度的试验研究[J].煤矿安全,2011,42(3):12-15. LI Chang-wen,WANG Rui,HE Zi-zi,et al.Experimental study on water conducted fissure height under rivers in Gaotouyao coal mine[J].Safety in Coal Mines,2011,42(3):12-15.
[2] 刘英锋,王 新.黄陇侏罗纪煤田顶板水害防治问题及对策探讨[J].西安科技大学学报,2013,33(4):431-435. LIU Ying-feng,WANG Xin.Water hazard prevention and control in Huanglong jurassic coalfield[J]. Journal of Xi'an University of Science and Technology,2013,33(4):431-435.
[3] 王 英,樊永贤,罗一夫.崔家沟煤矿矿井充水因素分析[J].西安科技大学学报,2012,32(6):722-725. WANG Ying,FAN Yong-xian,LUO Yi-fu. Water filling factors analysis of Cuijiagou coal mine[J].Journal of Xi'an University of Science and Technology,2012,32(6):722-725.
[4] 余学义,刘 俊,赵兵朝,等.孟巴矿特厚煤层分层开采覆岩导水裂隙带高度测定[J].煤矿安全,2013,42(8):169-171,174. YU Xue-yi,LIU Jun,ZHAO Bing-chao,et al.Determination on the height of slice mining overburden rock water flowing fractured zone of extremely thick coal seams in barapukuria coal mine of bangladesh[J].Safety in Coal Mines,2013,42(8):169-171,174.
[5] 刘 涛,徐东晶,付 青,等.大跨度深埋煤层导水裂隙带高度数值模拟研究[J].矿业研究与开发,2013,33(3):67-70. LIU Tao,XU Dong-jing,FU Qing,et al.Numerical simulation on the height of water-guiding fracture zone for deeply buried coal seam with large span of working face[J].Mining Research and Development,2013,33(3):67-70.
[6] 伍永平,于 水,高喜才,等.综放工作面导水裂隙带高度研究[J].煤炭工程,2012(10):59-61. WU Yong-ping,YU Shui,GAO Xi-cai,et al.Study on height of water flow fracture zone in fully mechanized caving face[J].Coal Engineering,2012(10):59-61.
[7] 李文生,李 文,尹尚先.特综采一次采全高顶板导水裂缝带发育高度研究[J].煤炭科学技术,2012,40(6):104-107. LI Wen-sheng,LI Wen,YIN Shang-xian.Study on development height of water flow crack zone in roof above fully mechanized one passing full seam mining face[J].Coal Science and Technology,2012,40(6):104-107.
[8] 余学义,刘 俊,王 鹏,等.特厚煤层分层开采导水裂隙带高度探测研究[J].中州煤炭,2013(7):4-7,11. YU Xue-yi,LIU Jun,WANG Peng,et al.Exploring research on height of water flowing fractured zone of extremely thick coal seams to slice mining[J].Zhongzhou Coal,2013(7):4-7,11.

相似文献/References:

[1]许满贵,刘欣凯,文新强,等.煤矿综采工作面粉尘分布及运移规律研究[J].西安科技大学学报,2014,(05):533.[doi:10.13800/j.cnki.xakjdxxb.2014.0505]
 XU Man-gui,LIU Xin-kai,WEN Xin-qiang,et al.Research of coal mine dust distribution and movement laws on fully-mechanized working face[J].Journal of Xi'an University of Science and Technology,2014,(03):533.[doi:10.13800/j.cnki.xakjdxxb.2014.0505]
[2]郝兵元,隋刚,康立勋.煤矿井下工作面生产系统可靠性仿真[J].西安科技大学学报,2008,(02):367.[doi:10.3969/j.issn.1672-9315.2008.02.037]
 HAO Bing-yuan SUI Gang KANG Li-xun.Reliability emulation of production system on mining working face[J].Journal of Xi'an University of Science and Technology,2008,(03):367.[doi:10.3969/j.issn.1672-9315.2008.02.037]

备注/Memo

备注/Memo:
作者简介:吕文宏(1966-),男,陕西华县人,工程师,E-mail:913981907@qq.com