[1]郭建新,高永涛.软破岩隧道围岩峰后剪胀变形及支护设计[J].西安科技大学学报,2010,(03):291-295.
 GUO Jian-xin,GAO Yong-tao.Analysis on weak surrounding rock tunnel post-peak cut expansion[J].Journal of Xi'an University of Science and Technology,2010,(03):291-295.
点击复制

软破岩隧道围岩峰后剪胀变形及支护设计()
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2010年03期
页码:
291-295
栏目:
出版日期:
2010-03-29

文章信息/Info

Title:
Analysis on weak surrounding rock tunnel post-peak cut expansion
文章编号:
1672-9315(2010)03-0291-05
作者:
郭建新12 高永涛1
1.北京科技大学 土木与环境工程学院,北京 100083; 2.河北省交通勘察设计研究院,石家庄 050011
Author(s):
GUO Jian-xin12GAO Yong-tao1
1.Civil and Environment Engineering School,University of Science and Technology Beijing,Beijing 100083, China; 2.Institute of Traffic Prospection and Design of Hebei Province,Shijiazhuang 050011,China
关键词:
软弱岩 峰后 变形 支护
Keywords:
Key words:weak surrounding rock post-peak deformation support
分类号:
U451.5
文献标志码:
A
摘要:
从软破围岩剪胀变形平衡理论出发,结合隧道工程实例,运用理论分析、数值模型和现场监测的手段,研究了软破围岩隧道在开挖过程中随着支护强度的不同,围岩峰后剪胀变形的力学特征和对围岩的控制作用。结果表明,软破围岩隧道峰后剪胀变形的时间和空间效应非常明显,易产生过大的位移和应力,并导致围岩或支护结构破坏。隧道浅部围岩剪胀剧烈,深部剪胀较弱,随着隧道围岩半径的增大,浅部围岩膨胀快速下降,深部下降较慢。随着支护强度的提高,围岩位移随开挖半径的增加由陡急逐渐变得平缓。采用软破岩峰后剪胀变形模型进行分析,弥补了弹塑性理论在计算软破围岩变形缺陷,更能反映隧道围岩变形与支护对软破围岩稳定性和变形控制的作用。
Abstract:
Based on the Theory of Weak Rock Rockbolt Displacement and combined with Yehuling No.2 tunnel engineering examples,the authors made a research and analysis on the effect of the release of displacement of surrounding space near soft rock tunnel, using theoretical analysis and site monitoring.By this way, reasonable choice of supporting time can be made according to surrounding rock creep curves. Results show that obvious time and space effect after the soft rock tunnel excavation will easily produce displacement and rock creep can cause damage to surrounding rock or retaining structure.Due to the existence of soft rock breaking properties, reasonable secondary supporting time can be worked out through site monitoring and theoretical calculation according to the displacement curve.This method is better than the past supporting time determined by experience or analogy method, and related design parameter and the actual inspection data coincide very much.

参考文献/References:

[1] 靳晓光,李晓红,杨春和.浅埋隧道围岩——支护结构稳定性研究[J].岩土力学,2005,26(9):1 473-1 476. JIN Xiao-guang,LI Xiao-hong,YANG Chun-he.Stability of surrounding rock-supports structure of deep buried tunnel[J].Rock and Soil Mechanics,2005,26(9):1 473-1 476.
[2] Ferrero A M.The shear strength of reinforced rock ioints[J].Int.J.Rock Mech.Sci.Geromeck.Abstr.,1997(6):595-603.
[3] 武振志,王剑军.浅埋软弱围岩双连拱隧道合理复合衬砌研究[J].公路交通科技,2007,24(2):94-98. WU Zhen-zhi,WANG Jian-jun.Study on reasonable composite lining of multi-arch tunnel in shallow soft stratum[J].Journal of Highway and Transportation Research and Development,2007,24(2):94-98.
[4] TANG Lei.LU Shi-liang.Rocf bolting of soft rock large span roadway in Shal Qucolliery[J].Journal of CUMT,1998,(2):37-42.
[5] 夏才初,李永盛.地下工程测试理论与监测技术[M].上海:同济大学出版社,1999. XIA Cai-chu,LI Yong-sheng.The Test Theories and Monitor Technology of Underground Engineering[M].Shanghai:Tongji University Press,1999.
[6] 刘佑荣,唐辉明.岩体力学[M].武汉:中国地质大学出版社,2002. LIU You-rong,Tang Hui-ming.Rock Mechanics[M].Wuhan:China University of Geosciences Press,2002.
[7] 高 谦,乔 兰,吴顺川.地下工程系统分析与设计[M].北京:中国建材工业出版社,2005. GAO Qian, QIAO Lan,WU Shun-chuan.The System Analysis and Design of Underground Engineering[M].Beijing:China Building Material Industy Publishing House,2005.
[8] 李利平,李术才,张庆松.浅埋大跨隧道现场试验研究[J].岩石力学与工程学报,2007,26(增1):3 565-3 571. LI Li-ping,LI Shu-cai,ZHANG Qing-song.Insitu testing study on shallow-buried large-span tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(suppl.):3 563-3 571.
[9] JTG d 70-2004,公路隧道设计规范[S]. JTG d70-2004,Code for Design of Road Tunnel [S].
[10]王继秀,赵均海,王乐健,等.基于统一强度理论的井筒围岩应力分析[J].建筑科学与工程学报,2009,26(3):105-109. WANG Ji-xiu,ZHAO Jun-hai,WANG Le-jian,et al.Stress analysis of wellbore rock based on unified strength theory[J].Journal of Architecture and Civil Engineering,2009,26(3):105-109.
[11]郝安民,周德源.静力弹塑性分析中目标位移的研究及应用[J].建筑科学与工程学报,2009,26(4):120-125. HAO An-min,ZHOU De-yuan.Research and application for target displacement in static elastoplastic analysis[J].Journal of Architecture and Civil Engineering,2009,26(4):120-125.

相似文献/References:

[1]汤雷,王五平.地下工程围岩的平面应变实验技术[J].西安科技大学学报,2006,(02):175.[doi:10.13800/j.cnki.xakjdxxb.2006.02.008]

备注/Memo

备注/Memo:
基金项目:河北省交通科学技术项目(Y-050226) 通讯作者:郭建新(1972-),男,河北承德人,高级工程师,主要从事隧道的设计与研究工作.