[1]刘海波,刘玉丽,任奋华,等.平顶山八矿地应力分布规律[J].西安科技大学学报,2009,(02):144-148.
 LIU Hai-bo,LIU Yu-li,REN Fen-hua,et al.Distribution regularities of in-situ stresses for eighthmine of Pingdingshan coal mining cooperation[J].Journal of Xi'an University of Science and Technology,2009,(02):144-148.
点击复制

平顶山八矿地应力分布规律()
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2009年02期
页码:
144-148
栏目:
出版日期:
2009-04-11

文章信息/Info

Title:
Distribution regularities of in-situ stresses for eighth mine of Pingdingshan coal mining cooperation
文章编号:
1672-9315(2009)02-0144-05
作者:
刘海波1刘玉丽2任奋华3苗胜军3
1.华北科技学院 土木工程系,北京 101601; 2.华北科技学院 基础课部,北京 101601; 3.北京科技大学 土木与环境工程学院,北京 100083
Author(s):
LIU Hai-bo1 LIU Yu-li2 REN Fen-hua3 MIAO Sheng-jun3
1.Dept. of Civil Engineering,North China Institute of Science and Technology,Beijing 101601,China; 2.Dept. of Basic Courses,North China Institute of Science and Technology,Beijing 101601,China; 3.School of Civil and Environmental Engineering,University of Science and Technology Beijing, Beijing 100083,China
关键词:
煤矿 地应力 应力解除 应力分布
Keywords:
coal mine in-situ stresses stress relief stress distribution
分类号:
TD311
文献标志码:
A
摘要:
为使巷道设计、支护计算和稳定性分析更加科学、可靠和经济,了解和研究地应力的大小、方向及其分布规律,提出地应力与巷道支护关系就尤为重要。文中详细介绍了平顶山八矿的地应力计算原理,并根据矿区实测地应力资料,得出了计算区域初始地应力场相应的应力回归公式,并且分析了矿井地应力的分布特征。
Abstract:
To make tunnel design, calculation of supporting and analysis of stabilitymore scientific, reliable and economic, research of the in-situ stress state,direction and distribution is particularly important.This paper introduces the in-situ stress measurement principle of the eighth mine of Pingdingshan coal mining cooperation. Based on the determined in-situ stresses,their distribution characteristics are obtained by using theoretical and statistical analyses. The relationship between in-situ stress and geological tectonism is studied and some meaningful conclusions are obtained.

参考文献/References:

[1] 蔡美峰.地应力测量原理和技术[M].北京:科学出版社,2000.
CAI Mei-feng. Principle and technology for in-situ stress measurement[M]. Beijing: Science Press,2000.
[2] 张延新,蔡美峰,王克忠.平顶山一矿地应力分布特征研究[J].岩石力学与工程学报,2004,23(3):4 033-4 037.
ZHANGYan-xin, CAI Mei-feng, WANG Ke-zhong. Study on distribution characteristics of in-situ stresses for Pingdingshan NO.1 Mine[J]. Chinese Journal of Rock Mechanics and Engineering, 2004,23(3):4 033-4 037.
[3] 刘允芳.岩体地应力与工程建设[M].北京:科学出版社,2000.
LIU Yun-fang. In-situ stress and construction of rock[M]. Beijing: Science Press,2000.
[4] 蔡美峰,乔 兰,于 波,等.峨口铁矿地应力测量原理和结果分析[J].北京科技大学学报,1996,18(2):101-106.
CAI Mei-feng,QIAO Lan,YU Bo,et al. Results of in-situ stress measurement in Ekou Iron Mine[J]. Journal of University of Science and Technology Beijing, 1996,18(2):101-106.
[5] Cai M,Qiao L,Li C.Application of an improved hollow inclusion technique for in-situ stress measurement in Xincheng gold mine, China[J]. Int.J.Rock Mech.Min.Sci., 1995,32(7): 735-739.
[6] 朱焕春,陶振宇.地应力研究新进展[J].武汉水利电力大学学报,1994,27(5):542-547.
ZHU Huan-chun,TAO Zhen-yu. New development in study on rock stress[J]. Journal of Wuhan University of Hydraulic and Electric Engineering, 1994,27(5):542-547.
[7] 蔡美峰.地应力解除技术在各种岩石条件下测量可靠性的试验和研究[J].岩石力学与程学报,1991,10(4):339.
CAI Mei-feng. Test and study of reliability of stress relief by overcoring techniques in different rock conditions[J]. Chinese Journal of Rock Mechanics and Engineering,1991,10(4):339.
[8] Wang Y,Wong T F.Finite element analysis of two overcoring techniques for in-situ stress measurement[J]. Int. J. Rock Mech.Min. Sci & Geomech.Abstr.,1987,24(1):41-52.
[9] 蔡美峰.地应力测量中温度补偿方法的研究[J].岩石力学与工程学报,1991,10(3):227-235.
CAI Mei-feng. Studies of temperature compensation techniques in rock stress measurements[J]. Chinese Journal of Rock Mechanics and Engineering, 1991,10(3):227-235.
[10]田冶友.矿区原岩应力场的测定与研究[J].岩石力学,1994,(5):21-26.
TIAN Zhi-you. In-situ stress measurement and study of mining[J]. Journal of Rock Mechanics,1994,(5):21-26.

相似文献/References:

[1]高晓旭,张 旭,董丁稳,等.煤矿危险源多层递阶模型及风险评价[J].西安科技大学学报,2015,(02):175.[doi:10.13800/j.cnki.xakjdxxb.2015.0207]
 GAO Xiao-xu,ZHANG Xu,DONG Ding-wen,et al.Multi-layer hierarchical structure model and risk evaluation for mine hazards[J].Journal of Xi'an University of Science and Technology,2015,(02):175.[doi:10.13800/j.cnki.xakjdxxb.2015.0207]
[2]孟然,徐经苍,魏攀,等.顺层瓦斯抽放钻孔渗流场数值模拟及应用[J].西安科技大学学报,2015,(05):561.[doi:10.13800/j.cnki.xakjdxxb.2015.0506]
 MENG Ran,XU Jing-cang,WEI Pan,et al.Numerical simulation and application of drilling gas drainage holes along seam in current seam[J].Journal of Xi'an University of Science and Technology,2015,(02):561.[doi:10.13800/j.cnki.xakjdxxb.2015.0506]
[3]李琰,于瑾慧,李红霞,等.煤矿安全专家合作网网络特征分析[J].西安科技大学学报,2015,(06):800.[doi:10.13800/j.cnki.xakjdxxb.2015.0621]
 LI Yan,YU Jin-hui,LI Hong-xia,et al.Characteristics of coal mine safety experts'cooperationnetwork[J].Journal of Xi'an University of Science and Technology,2015,(02):800.[doi:10.13800/j.cnki.xakjdxxb.2015.0621]
[4]田水承,孙曙英,于观华,等.煤矿险兆事件主动上报意愿影响因素研究[J].西安科技大学学报,2014,(05):517.[doi:10.13800/j.cnki.xakjdxxb.2014.0502]
 TIAN Shui-cheng,SUN Shu-ying,YU Guan-hua,et al.Influencing factors of near-miss initiative report in coal mine[J].Journal of Xi'an University of Science and Technology,2014,(02):517.[doi:10.13800/j.cnki.xakjdxxb.2014.0502]
[5]袁晓芳,李红霞,田水承,等.基于BioLAB的煤矿工人突发事件场景下应急反应的评估研究[J].西安科技大学学报,2014,(05):546.[doi:10.13800/j.cnki.xakjdxxb.2014.0507]
 YUAN Xiao-fang,LI Hong-xia,TIAN Shui-cheng,et al.Evaluation of coal miners'emergency response capacity in emergency scenarios based on BioLAB[J].Journal of Xi'an University of Science and Technology,2014,(02):546.[doi:10.13800/j.cnki.xakjdxxb.2014.0507]
[6]马莉,李树刚,肖鹏,等.云计算环境下煤矿应急管理海量数据存储技术[J].西安科技大学学报,2014,(05):596.[doi:10.13800/j.cnki.xakjdxxb.2014.0516]
 MA Li,LI Shu-gang,XIAO Peng,et al.Massive data storing technique of coal mine emergency management in cloud computing[J].Journal of Xi'an University of Science and Technology,2014,(02):596.[doi:10.13800/j.cnki.xakjdxxb.2014.0516]
[7]张红涛,王 星,蔡文龙,等.煤矿10 kV供电系统电容电流计算方法[J].西安科技大学学报,2016,(02):282.
 ZHANG Hong-tao,WANG Xing,CAI Wen-long,et al.Capacitive current calculation methods of 10 kV power system in coal mine[J].Journal of Xi'an University of Science and Technology,2016,(02):282.
[8]董丁稳,陈 赞.基于贝叶斯分类的煤矿系统安全动态定量评价[J].西安科技大学学报,2015,(03):320.
 DONG Ding-wen,CHEN Zan.Dynamic and quantitative safety evaluation of mine system based on Bayesian classification[J].Journal of Xi'an University of Science and Technology,2015,(02):320.
[9]姜杰.煤矿机器设备的可靠性研究[J].西安科技大学学报,2014,(01):75.
 JIANG Jie.Research on reliability of coal mine machinery and equipment[J].Journal of Xi'an University of Science and Technology,2014,(02):75.
[10]何叶荣,洪力学,黄廷辉.基于PR-SEM的煤矿安全管理风险因素综合评价[J].西安科技大学学报,2018,(05):845.[doi:10.13800/j.cnki.xakjdxxb.2018.0521]
 HE Ye-rong,HONG Li-xue,HUANG Ting-hui.Comprehensive evaluation of risk factors of coal mine safety management based on PR-SEM[J].Journal of Xi'an University of Science and Technology,2018,(02):845.[doi:10.13800/j.cnki.xakjdxxb.2018.0521]
[11]刘海波,刘玉丽,林大超,等.巷道耦合支护优化设计[J].西安科技大学学报,2010,(02):182.
 LIU Hai-bo,LIU Yu-li,LIN Da-chao,et al.Optimized tunnel design and coupling support[J].Journal of Xi'an University of Science and Technology,2010,(02):182.

备注/Memo

备注/Memo:
收稿日期: 2008-08-10 基金项目: “十一五”国家科技支撑计划项目(2006BAB02A17); 国家“863”项目(2007AA06Z132) 作者简介: 刘海波(1977-),男,黑龙江哈尔滨人,硕士,主要从事岩土工程教学与研究工作.
更新日期/Last Update: 2009-04-11