[1]余波江,赵时运,张振华,等.深基坑逆作法施工土方跃层开挖的数值模拟与实测分析[J].西安科技大学学报,2018,(05):751-757.[doi:10.13800/j.cnki.xakjdxxb.2018.0509]
 YU Bo-jiang,ZHAO Shi-yun,ZHANG Zhen-hua,et al.Numerical simulation and measurement analysis of earthwork thermocline excavation in reverse construction method for a deep foundation pit[J].Journal of Xi'an University of Science and Technology,2018,(05):751-757.[doi:10.13800/j.cnki.xakjdxxb.2018.0509]
点击复制

深基坑逆作法施工土方跃层开挖的数值模拟与实测分析(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2018年05期
页码:
751-757
栏目:
出版日期:
2018-09-30

文章信息/Info

Title:
Numerical simulation and measurement analysis of earthwork thermocline excavation in reverse construction method for a deep foundation pit
文章编号:
1672-9315(2018)05-0758-09
作者:
余波江1赵时运2张振华3钱礼平1曾 伟1
1.安徽省建筑科学研究设计院,安徽 合肥 230001; 2.安徽建工集团有限公司,安徽 合肥 230031; 3.合肥工业大学 土木与水利工程学院,安徽 合肥 230009
Author(s):
YU Bo-jiang1ZHAO Shi-yun2ZHANG Zhen-hua3QIAN Li-ping1ZENG Wei1
1.Anhui Architectural Science Research and Design Institute,Hefei 230001,China; 2.Anhui Construction Engineering Group Co.,Ltd.,Hefei 230031,China; 3.School of Civil Engineering,Hefei University of Technology,Hefei 230009,China
关键词:
大型深基坑 逆作法施工 数值模拟与实测 跃层开挖 地下连续墙 变形特征
Keywords:
large deep foundation pit reverse construction numerical simulation and measurement thermocline excavation diaphragm wall deformation characteristics
分类号:
TU 924
DOI:
10.13800/j.cnki.xakjdxxb.2018.0509
文献标志码:
A
摘要:
结合某大型深基坑工程实例,借助大型岩土类有限元分析软件Midas-GTS,对基坑在土方跃层开挖施工过程中地下连续墙与临界基坑地表的变形进行动态的数值模拟; 同时,通过地下连续墙的水平变形监测,获得地下连续墙典型测点随基坑开挖深度变化的曲线。通过对数值模拟成果和现场实测结果的综合分析与对比,获得该深基坑土方跃层开挖过程中地下连续墙及周边土体的变形响应特征。结果表明:土方跃层开挖将对地下连续墙及周边环境产生不利影响,其产生的地下连续墙最大水平位移值约20 mm,但仍在合理值范围内; 适当的采取施工措施,如在基坑四周尽可能预留较多反压土,可有效减小土方跃层开挖对地下连续墙产生的不利影响。研究成果对指导类似深基坑的设计和施工具有重要的参考价值。
Abstract:
With a large and deep foundation pit engineering examples,using the large-scale geotechnical finite element analysis software Midas-GTS,we simulate the change state of the deformation of foundation pit earthwork in the thermocline in the process of excavation of underground continuous wall and the critical excavation surface.At the same time,through monitoring the deformation of underground continuous wall,obtain the typical measuring points curve of underground continuous wallwith excavation depth changes.Through the comprehensive analysis and comparison of numerical simulation results and field measurement results,the deformation response characteristics of underground continuous wall and surrounding soil during the excavation process of deep foundation pit are obtained.The results show that the earthwork thermocline excavation has adverse effect onunderground continuous wall and the surrounding environment,the maximum horizontal displacement of underground continuous wall is about 20 mm,but still in a reasonable range.We suggest taking proper construction measures,such as set aside more anti-pressure soil around the pit,can effectively reduce the adverse effects of earthwork thermocline the excavation of the underground continuous wall.The research results have important reference for guiding the design and construction of similar deep foundation pit.

参考文献/References:

[1] 徐至均,赵锡宏.深基坑支护理论与技术新发展逆作法设计与施工[M].北京:机械工业出版社,2002. XU Zhi-jun,ZHAO Xi-hong.Design and construction of deep foundation pit support theory and technology new development inverse method[M].Beijing:Machinery Industry Press,2002. [2]范庆国,赵锡宏.深基坑工程逆作法的理论与计算[J].岩土力学,2006,27(12):2169-2176. FAN Qing-guo,ZHAO Xi-hong.Theory and computation of up-down construction method for deep excavation engineering[J].Rock and Soil Mechanics,2006,27(12):2169-2176. [3]李镜培,柏 挺,杨 军.框架逆作超大深基坑施工对周边环境的影响[J].岩石力学与工程学,2012,11(31):2354-2363. LI Jing-pei,BO Ting,YANG Jun.Influence of construction of super-large excavation with frame-top-down method on environments[J].Chinese Journal of Rock.Mechanics and Engineering,2012,11(31):2354-2363. [4]王卫东,徐中华.预估深基坑开挖对周边建筑物影响简化分析方法[J].岩土工程学报,2010,32(增 1):32-38. WANG Wei-dong,XU Zhong-hua.Simplified analysis method for evaluating excavation-induced damage of adjacent buildings[J].Chinese Journal of Geotechnical Engineering,2010,32(Supp.1):32-38. [5]Laefer D F.Predicting RC frame response to excavation-induced settlement[J].Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2009,135(11):1605-1619. [6]Son M,Cording E J.Estimation of building damage due to excavation-induced ground movements[J].Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2005,131(2):162-177. [7]朱宪辉,汪贵平,顾倩燕.逆作法深基坑在超高层建筑中的设计应用[J].岩土工程学报,2006,28:1565-1568. ZHU Xian-hui,WANG Gui-ping,GU Qian-yan.Design and practices of deep foundation pits of towering buildings constructed by top-down method[J].Chinese Journal of Geotechnical Engineering,2006,28:1565-1568. [8]李定江,钟 铮.深基坑工程中跃层逆作法施工关键技术研究[J].建筑施工,2009,31(5):313-315. LI Ding-jiang,ZHONG Zheng.Key technology research on inverse construction method of thermocline in deep foundation pit engineering[J].Building Construction,2009,31(5):313-315. [9]芮 瑞,夏元友.基于三维有限元的地下连续墙深基坑逆作法施工方案设计[J].岩土力学,2008,29(5):1391-1395. RUI Rui,XIA Yuan-you.Deep foundation pit top-down construction scheme design based on three dimensional finite element[J].Rock and Soil Mechanics,2008,29(5):1391-1395. [10]谢小松,徐 伟.“半顺作半逆作法”基坑开挖中地下连续墙有限元分析[J].结构工程师,2007,23(3):22-25. XIE Xiao-song,XU Wei.Finite element analysis of diaphragm wall in excavation of foundation pit with semi parallel and semi top-down method[J].Structural Engineer,2007,23(3):22-25. [11]谢贻军,钱德玲,魏雪云.紧邻地铁站的超大深基坑逆作法变形规律研究[J].合肥工业大学学报:自然科学版,2014,37(10):1231-1238. XIE Yi-jun,QIAN De-ling,WEI Xue-yun.Deformation law of super large deep foundation pit adjacent to subway station.[J].Journal of Hefei University of Technology:Natural Science Edition,2014,37(10):1231-1238. [12]朱建新,袁海平,吴祥松.深基坑开挖过程的动态模拟设计[J].南方冶金学院学报,2003,24(1):41-45. ZHU Jian-xin,YUAN Hai-ping,WU Xiang-song.Dynamic simulation design of excavation process of deep foundation pit[J].Journal of South Institute of Metallurgy,2003,24(1):41-45. [13]刘学军.超深基坑地下连续墙全逆作法施工与内力一体化分析[J].建筑科学,2012; 28(11):91-94. LIU Xue-jun.Integrated analysis of construction and internal force of diaphragm wall of ultra deep foundation pit[J].Building Science,2012,28(11):91-94. [14]王允恭.逆作法设计施工与实例[M].北京:中国建筑工业出版社,2011. WANG Yun-gong.Top-down design,construction and examples[M].Beijing:China Construction Industry Press,2011. [15]刘兴旺,施祖元,益德清,等.软土地区基坑开挖变形性状研究[J].岩土工程学报,1999,21(4):456-460. LIU Xing-wang,SHI Zu-yuan,YI De-qing,et al.Research on deformation behavior of foundation pit in soft soil area[J].Journal of Geotechnical Engineering,1999,21(4):456-460. [16]谢小松,游建平,徐伟.超大型深基坑工程部分逆作法施工过程三维有限元模拟[J].岩土工程学报,2008,30(S):46-49. XIE Xiao-song,YOU Jian-ping,XU Wei.The three-dimensional finite element simulation of the construction process of the super large deep foundation pit engineering part[J].Geotechnical Engineering,2008,30(S):46-49. [17]刘继强.考虑蠕变的邻近地铁隧道深基坑开挖工序优化[J].铁道工程学报,2014(9):108-114. LIU Ji-qiang.Optimization of excavation process of deep foundation pit adjacent to metro tunnel considering creep[J].Journal of Railway Engineering,2014(9):108-114. [18]王洪涛,周鹏华.邻近地铁的建筑深基坑的设计与施工[J].建筑施工,2015,37(3):295-297,300. WANG Hong-tao,ZHOU Peng-hua.Design and construction of deep foundation pit adjacent to subway construction[J].Building Construction,2015,37(3):295-297,300. [19]Itasca Consulting Group.Fast lagrangian analysis of continua in three dimensions[M].Minneapolis:Itasca Consulting Group,1997. [20]周荣鑫.地下结构逆作法施工技术研究[D].上海:同济大学,2007. ZHOU Rong-xin.Research on construction technology of underground structure inverse method[D].Shanghai:Tongji University,2007. [21]殷宗泽,朱 宏,许国华.土与结构材料接触面的变形及其数学模拟[J].岩土工程学报,1996,16(3):32-34. YIN Zong-ze,ZHU Hong,XU Guo-hua.Deformation and mathematical simulation of the contact surface of soil and structural materials[J].Journal of Geotechnical Engineering,1996,16(3):32-34. [22]李佳川,夏明耀.地下连续墙深基坑开挖与纵向地下管线保护[J].同济大学学报:自然科学版,1995(5):499-504. LI Jia-chuan,XIA Ming-yao.Underground continuous wall in deep excavation and vertical underground pipeline protection[J].Journal of Tongji University:Natural Science Edition,1995(5):499-504. [23]Wamer D S,Nieber J L,Moore I D,et al.Chara cterizing macrospores in soil by computed topography[J].Geoderma,1990,46:13-29. [24]贾 坚.逆作开挖深基坑控制卸载变形的方法与实践[J].岩土工程学报,2007,29(2):304-308. JIA Jian.Method and practice of controlling unload deformation in excavation of deep foundation pit[J].Journal of Geotechnical Engineering,2007,29(2):304-308. [25]郑 刚,陈红庆.基坑开挖反压土作用机制及其简化分析方法研究[J].岩土力学,2007,28(6):1161-66. ZHENG Gang,CHEN Hong-qing,et al.A study of mechanism of earth berm and simplified analysis method for excavation[J].Rock and Soil Mechanics,2007,28(6):1161-1166.

备注/Memo

备注/Memo:
收稿日期:2018-06-28 责任编辑:李克永
基金项目:安徽省科技厅科技计划项目(1604a0802118)
通信作者:余波江(1986-),男,安徽霍山人,工程师,E-mail:531181372@qq.com