[1]屈永超.综放沿空留巷覆岩运动规律及监测研究[J].西安科技大学学报,2018,(01):65-70.[doi:10.13800/j.cnki.xakjdxxb.2018.0110]
 QU Yong-chao.Overburdern movement and monitoring of gob-side entry retaining in fully mechanized caving face[J].Journal of Xi'an University of Science and Technology,2018,(01):65-70.[doi:10.13800/j.cnki.xakjdxxb.2018.0110]
点击复制

综放沿空留巷覆岩运动规律及监测研究(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2018年01期
页码:
65-70
栏目:
出版日期:
2018-01-15

文章信息/Info

Title:
Overburdern movement and monitoring of gob-side entry retaining in fully mechanized caving face
文章编号:
1672-9315(2018)01-0065-06
作者:
屈永超
国投新登郑州煤业有限公司,河南 郑州 452477
Author(s):
QU Yong-chao
SDIC Xindeng Zhengzhou Coal Industry Co.,Ltd.,Zhengzhou 452477,China
关键词:
三软煤层 综放采场 覆岩移动 数值模拟 现场监测
Keywords:
“three soft”coal seam fully mechanized top-coal caving face overburden movement numerical simulation field monitoring
分类号:
TD 32
DOI:
10.13800/j.cnki.xakjdxxb.2018.0110
文献标志码:
A
摘要:
为了研究三软煤层综放开采条件下沿空留巷的矿压显现规律,以国投新登煤矿31061工作面为研究对象,采用CDEM数值模拟软件、现场矿压及围岩移动监测和留巷工业性试验相结合的方法,研究了三软煤层综放采场侧向覆岩移动规律及矿山压力的时空变化规律,并对沿空巷道变形及矿压进行了现场监测。结果表明:31061工作面开挖到9.6,20,30 m时,分别发生了直接顶初次垮落、基本顶初次来压和第一次周期来压,开挖过程矿压显现较为强烈,应力分布主要集中于工作面前方20 m左右,工作面上覆岩层存在明显的三带特征; 工作面后方留巷根据矿压显现特征可以划分为:压力缓慢升高阶段、压力快速增加阶段和压力稳定阶段,采空区后70 m左右是进行二次维修的合理位置。根据矿压显现特征分别提出了留巷过渡段临时支护方案和维修后正常段支护方案,现场工业试验表明利用临时支护渡过动压影响阶段,然后巷道进行二次维修并替换为正常支护,可以保证留巷围岩稳定,满足生产的需求。
Abstract:
In order to study the displacement law of road along gob-side in fully mechanized top-coal caving face with soft coal seam and surrounding rock strata,the 31061 fully mechanized caving face in Xindeng coal mine was taken as the in-site engineering.Based on the combination of numerical simulation and field monitoring,the law of lateral overburden movement and the spatial-temporal variation of ground pressure in fully mechanized top coal caving face were studied,and the supporting plan for the road along gob-side was proposed.The results showed that the distance of failure of direct roof,first failure of main roof and first period failure of main roof were 9.6,20 and 30 m,respectively.The strata pressure behavior showed very obviously.The stress concentration was mainly in the area of 20 m advancing the face.The pressure behavior behind face showed obviously three stage which were pressure rising slowly stage,pressure rising rapidly stage and pressure stable stage.The location suitable for maintaining the rock along gob-side was 70 m from the face.Based on the pressure behavior,the supporting plan for the transition period and normal period for road along gob-side was proposed.The in-site experiment showed that it is suitable for 31061 longwall face to use the temporary supporting method in the transition period,and maintain the road along gob-side in the pressure stable stagewith normal supporting method.

参考文献/References:

[1] 张 农,韩昌良,阚甲广,等.沿空留巷围岩控制理论与实践[J].煤炭学报,2014(8):1635-1641. ZHANG Nong,HANG Chang-liang,KAN Jia-guang,et al.Theory and practice of surrounding rock control for pillarless gob-side entry retaining[J].Journal of China Coal Society,2014,39(8):1635-1641.
[2]陈 勇.沿空留巷围岩结构运动稳定机理与控制研究[D].北京:中国矿业大学,2012. CHEN Yong.Research on control and mechanism of movement of surrounding rock of road along gob-side[D].Beijing:China University of Mining and Technology,2012.
[3]张东升,茅献彪,马文顶.综放沿空留巷围岩变形特征的试验研究[J].岩石力学与工程学报,2002,21(3):331-334. ZHANG Dong-sheng,MAO Xian-biao,MA Wen-ding.Testing study on deformation features of surrounding rocks of gob-side entry retaining in fully-mechanized coal face with top-coal caving[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(3):331-334.
[4]漆泰岳,郭育光,侯朝炯.沿空留巷整体浇注护巷带适应性研究[J].煤炭学报,1999,24(3):256-260. QI Tai-yue,GUO Yu-guang,HOU Chao-jiong.Study on the adaptability for the pack-fillings of the gob-side entry re-taming[J].Journal of China Coal Society,1999,24(3):256-260.
[5]潘一山,肖永惠,李忠华,等.冲击地压矿井巷道支护理论研究及应用[J].煤炭学报,2014(2):222-228. PAN Yi-shan,XIAO Yong-hui,LI Zhong-hua,et al.Study of tunnel support theory of rockburst in coal mine and its application[J].Journal of China Coal Society,2014,39(2); 222-228.
[6]刘洪涛,王 飞,王广辉,等.大变形巷道顶板可接长锚杆支护系统性能研究[J].煤炭学报,2014,39(4):600-607. LIU Hong-tao,WANG Fei,WANG Guang-hui,et al.On the performance of lengthened bolt coupling support system in roadway roof[J].Journal of China Coal Society,2014,39(4):600-607.
[7]张 农,张志义,吴 海,等.深井沿空留巷扩刷修复技术及应用[J].岩石力学与工程学报,2014,33(3):468-474. ZHANG Nong,ZHANG Zhi-yi,WU Hai,et al.Technology and application of reparation in deep gob-side entry retaining[J].Chinese Journal of Rock Mechanics and Engineering,2014,33(3):468-474.
[8]朱川曲,张道兵,施式亮,等.综放沿空留巷支护结构的可靠性分析[J].煤炭学报,2006(2):141-144. ZHU Chuan-qu,ZHANG Dao-bing,SHI Shi-liang,et al.Reliability analysis on support structure of gob-side entry retaining in fully-mechanized caving face[J].Journal of China Coal Society,2006,31(2):141-144.
[9]华心祝,刘 淑,刘增辉,等.孤岛工作面沿空掘巷矿压特征研究及工程应用[J].岩石力学与工程学报,2011,30(8):1646-1651. HUA Xin-zhu,LIU Shu,LIU Zeng-hui,et al.Research onstrata pressure characteristic of gob-side entry driving in island mining face and its engineering application[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(8):1646-1651.
[10]黄艳利,张吉雄,巨 峰.巷旁充填沿空留巷技术及矿压显现规律[J].西安科技大学学报,2009,29(5):515-520. HUANG Yan-li,ZHANG Ji-xiong,JU Feng.Technology of roadside packing in gob-side entry retaining and law of rock pressure[J].Journal of Xi'an University of Science and Technology,2009,29(5):515-520.
[11]康红普,牛多龙,张 镇,等.深部沿空留巷围岩变形特征与支护技术[J].岩石力学与工程学报,2010,29(10):1977-1987. KANG Hong-pu,NIU Duo-long,ZHANG Zhen,et al.Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1977-1987.

相似文献/References:

[1]李春杰,刘银先,高红彬,等.“三软”煤层采场覆岩运动及应力分布规律[J].西安科技大学学报,2015,(02):187.[doi:10.13800/j.cnki.xakjdxxb.2015.0209]
 LI Chun-jie,LIU Yin-xian,GAO Hong-bin,et al.Overlying strata movement and stress distribution law in the“three-soft”coal seam[J].Journal of Xi'an University of Science and Technology,2015,(01):187.[doi:10.13800/j.cnki.xakjdxxb.2015.0209]
[2]黄庆享,石中情.三软煤层巷道围岩自稳平衡圈分析[J].西安科技大学学报,2016,(03):331.[doi:10.13800/j.cnki.xakjdxxb.2016.0306]
 HUANG Qing-xiang,SHI Zhong-qing.Theory of equilibrium circle of roadway in three soft coal seam[J].Journal of Xi'an University of Science and Technology,2016,(01):331.[doi:10.13800/j.cnki.xakjdxxb.2016.0306]
[3]来兴平,许慧聪,康延雷.综放面覆岩运动“时-空-强”演化规律分析[J].西安科技大学学报,2018,(06):871.[doi:10.13800/j.cnki.xakjdxxb.2018.0601]
 LAI Xing-ping,XU Hui-cong,KANG Yan-lei.Analysis on “spatio-tempo-intension” evolution rules ofoverburden strata movement in fully mechanized top-coal caving face[J].Journal of Xi'an University of Science and Technology,2018,(01):871.[doi:10.13800/j.cnki.xakjdxxb.2018.0601]