[1]孙学阳,安孝会,苗霖田,等.煤矿井工开采对上覆反向滑坡扰动的模拟研究[J].西安科技大学学报,2017,(01):71-77.[doi:10.13800/j.cnki.xakjdxxb.2017.0112]
 SUN Xue-yang,AN Xiao-hui,MIAO Lin-tian,et al.Simulation study on the disturbance of coal mining on the reverse landslide[J].Journal of Xi'an University of Science and Technology,2017,(01):71-77.[doi:10.13800/j.cnki.xakjdxxb.2017.0112]
点击复制

煤矿井工开采对上覆反向滑坡扰动的模拟研究(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2017年01期
页码:
71-77
栏目:
出版日期:
2017-01-30

文章信息/Info

Title:
Simulation study on the disturbance of coal mining on the reverse landslide
文章编号:
1672-9315(2017)01-0071-07
作者:
孙学阳12安孝会1苗霖田2李鹏强1
1.西安科技大学 地质与环境学院,陕西 西安 710054; 2.国土资源部 煤炭资源勘查与综合利用重点实验室,陕西 西安 710021
Author(s):
SUN Xue-yang12AN Xiao-hui1MIAO Lin-tian2LI Peng-qiang1
1.College of Geology and Environment,Xi'an University of Science and Technology,Xi'an 710054,China; 2.Key Laboratory of Coal Resource Exploration and Comprehensive Utilization,Ministry of Land and Resourse,Xi'an 710021,China
关键词:
黄土滑坡 覆岩破坏 相似材料模拟 数值模拟 产状
Keywords:
Key words:loess landslide deformation of overlying strata similar material simulation numerical simulation inclination
分类号:
TD 167
DOI:
10.13800/j.cnki.xakjdxxb.2017.0112
文献标志码:
A
摘要:
煤系地层的产状与上覆滑坡的产状关系,是影响黄土滑坡稳定性的决定性因素之一。研究煤系地层的倾角与黄土滑坡的倾角相同而倾向相反条件下,主采煤层开采对上覆黄土滑坡的影响,对于滑坡的治理具有重要意义。采用相似材料模拟实验方法,通过模拟含煤岩系倾角30°时的煤层井工开采,总结出上覆岩层移动变形及裂隙分布发育规律和反向黄土滑坡稳定性条件。结果表明:上覆岩层冒落带高度为25.0 m; 裂隙带发育高度为72.0 m; 采空区范围内覆岩最大下沉值偏向岩层倾向; 在工作面推进120 m时黄土滑坡处于临界失稳状态。通过离散元数值模拟模型与相似模拟实验进行了对比,验证了该相似材料模拟实验的可靠性。
Abstract:
bstract:The occurrence relationship between coal measure strata and overlying landslide is one of the decisive factors which affect the stability of loess landslide.It is of great significance for landslide treatment to know how the main coal seam mining influences the stability of overlying landslide when the coal measure strata and overlying landslide have the opposite attitude.Similar material simulation experiment method was adopted to testify the mechanism of overlying rock destruction and fracture,and the law of joint fissures and stability condition of the loess landslide due to the coal seam mining through the simulation of coal measure strata dip of 30°mining was concluded.Results show that caving height of overlying rock is 25.0 meters while crack height of overlying strata is 72.0 meters,and the maximum subsidence of overlying rock has a tendency towards overlying the attitude of rocks.When the working face advanced a total of 120 meters,the loess landslide is in a state of critical instability.The reliability of the similar material simulation experiment is verified via the comparison of the discrete element numerical simulation model and similarity simulation experiment

参考文献/References:

[1] 胡晋山,何宗宜,康建荣,等.山区地下开采坡体稳定性分析及滑坡预报系统的设计[J].中国矿业,2009,18(11):112-125. HU Jin-shan,HE Zong-yi,KANG Jian-rong,et al.Slope stability analysis and landslide forecasting system design in the mountainous mining area[J]. China Mining Magazine,2009,18(11):112-125. [2]王 瑞,吕义清,张华伟,等.采空滑坡成因机制分析[J].煤炭技术,2015,34(10):204-206. WANG Rui,LV Yi-qing,ZHANG Hua-wei,et al.Analyzing formation mechanism of gob landslide[J]. Coal Technology,2015,34(10):204-206. [3]刘新喜,陈向阳.地下开采沉陷对滑坡灾害的影响分析[J].中国安全科学学报,2010,12:3-7. LIU Xin-xi,CHEN Xiang-yang.Effect analysis of underground mining subsidence on landside disasters[J]. China Safety Science Journal,2010,12:3-7. [4]徐廷甫,尹志明,邓月华.地下采动条件下顺层岩质边坡稳定性分析[J].地下空间与工程学报,2011,7(6):1 241-1 246. XU Ting-fu,YIN Zhi-ming,DENG Yue-hua.Stability analysis of bedding rock slope at underground mining conditions[J]. Chinese Journal of Underground Space and Engineering,,2011,7(6):1 241-1 246. [5]王振伟,张青波,刘天苹,等.地下开采引起覆岩破坏及边坡变形的数值模拟[J].煤矿安全,2014(2):207-211. WANG Zhen-wei,ZHANG Qing-bo,LIU Tian-ping,et al.Numerical simulation of strata failure and slope deformation in underground mining[J]. Coal Mine Safety,2014(2):207-211. [6]丁启新,乔 兰.安家岭矿高陡边坡滑动破坏机理分析[J].中国矿业,2009,18(12):91-95. DING Qi-xin,QIAO Lan.Analysis of failure mechanism of high and steep slope in Anjialing mine[J]. China Mining Magazine,2009,18(12):91-95. [7]张 栋,汪华君,范育青.山体浅埋煤层采动坡体的稳定性分析[J].煤矿安全,2014(4):195-197. ZHANG Dong,WANG Hua-jun,FAN Yu-qing.Stability analysis of mining slope in mountain shallow seam[J]. Coal Mine Safety,2014(4):195-197. [8]潘 懿,唐绍辉,黄英华.群采空区及其诱发高陡边坡地质灾害综合治理技术研究[J].矿业研究与开发,2014,34(4):128-131. PAN Yi,TANG Shao-hui,HUANG Ying-hua. Study on comprehensive control technology of goaf group and its induced geological disasters of high and steep slope[J]. Mining Research and Development,2014,34(4):128-131. [9]丁鑫品,王 俊,李 伟,等.关键层耦合作用下露井联采边坡滑动深度分析[J].煤炭学报,2014,39(S2):354-358. DING Xin-pin,WANG Jun,LI Wei,et al.Analysis of slope sliding depth for open-underground combined mining under coupling effects about key strata[J]. Journal of China Coal Society,2014,39(S2):354-358. [10]饶文英,郭增玉.黄土高边坡的滑坡机理与稳定分析方法的探讨[J].山西机械学院学报,1988,4(2):54-56. RAO Wen-ying,GUO Zeng-yu.Mechanism of landslide for high loess slop and discussion on stability analysis method[J]. Journal of Shanxi Mechanical Engineering Institue,1988,4(2):54-56. [11]单晓云,姜耀东,王乐杰,等.地下采煤对巍山山体裂缝影响的有限元分析[J].煤炭学报,2008,33(1):23-27. SHAN Xiao-yun,JIANG Yao-dong,WANG Le-jie,et al.Finite element analysis of effect of underground coal mining on landslide of the wei mountain[J].Journal of China Coal Society,2008,33(1):23-27. [12]汤伏全.试验模型变形测量数码照相装置研究[J].测绘通报,2012(3):36-39. TANG Fu-quan.Study of digital photographic device to observe deformation for test model[J]. Bulletin of Surveying and Mapping,2012(3):36-39.

相似文献/References:

[1]马雄德,王苏健,蒋泽泉,等.神南矿区采煤导水裂隙带高度预测[J].西安科技大学学报,2016,(05):664.[doi:10.13800/j.cnki.xakjdxxb.2016.0509]
 MA Xiong-de,WANG Su-jian,JIANG ZE-quan,et al.Prediction on the height of water-flowing fractured zone in southern Shenmu mine[J].Journal of Xi'an University of Science and Technology,2016,(01):664.[doi:10.13800/j.cnki.xakjdxxb.2016.0509]
[2]段 钊,李文可,王启耀.泾河下游台塬区黄土滑坡类型与时空分布规律[J].西安科技大学学报,2015,(03):369.
 DUAN Zhao,LI Wen-ke,WANG Qi-yao.Types and spatial-temporal distribution of loess landslides in the south plateau of lower Jing river[J].Journal of Xi'an University of Science and Technology,2015,(01):369.
[3]罗丽娟,赵法锁,陈新建,等.巨型黄土滑坡剪出口滑带土的原位剪切试验研究[J].西安科技大学学报,2009,(04):459.[doi:10.13800/j.cnki.xakjdxxb.2009.04.016]
[4]郑志勇.黄土滑坡的形成机理[J].西安科技大学学报,2008,(04):694.
 ZHENG Zhi-yong.Analysis on the formative mechanism of the loess landslides in Tongchuan[J].Journal of Xi'an University of Science and Technology,2008,(01):694.
[5]王念秦,张 宁,段 钊.泾阳南塬黄土滑坡冲击阶地易侵蚀层过程模拟[J].西安科技大学学报,2020,(02):244.
 WANG Nian-qin,ZHANG Ning,DUAN Zhao.Impacting pocess simulation of loess landslides on the easily-eroded terrace layers at south Jingyang plateau[J].Journal of Xi'an University of Science and Technology,2020,(01):244.

备注/Memo

备注/Memo:
基金项目:国家自然科学基金(41272388,51674195); 国土资源部煤炭资源勘查与综合利用重点实验室科研项目(KF2016-2) 通讯作者:孙学阳(1976-),男,安徽涡阳人,副教授,E-mail:sxy163@163.com
更新日期/Last Update: 1900-01-01