[1]王凌波,蒋逢炜,招国忠,等.特种车通过曲线部分斜拉桥的运营安全分析[J].西安科技大学学报,2016,(02):288-295.
 WANG Ling-bo,JIANG Feng-wei,ZHAO Guo-zhong,et al.Operational safety analysis of special vehicle driving through an extradosed bridge with curve shape[J].Journal of Xi'an University of Science and Technology,2016,(02):288-295.
点击复制

特种车通过曲线部分斜拉桥的运营安全分析(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2016年02期
页码:
288-295
栏目:
出版日期:
2016-04-11

文章信息/Info

Title:
Operational safety analysis of special vehicle driving through an extradosed bridge with curve shape
文章编号:
10.13800/j.cnki.xakjdxxb.2016.0222
作者:
王凌波1蒋逢炜12招国忠3贺拴海1
1.长安大学 公路学院,陕西 西安 710064; 2.中交路技术有限公司,北京 100000; 3.广州大广高速公路有限公司,广东 广州 510000
Author(s):
WANG Ling-bo1JIANG Feng-wei12ZHAO Guo-zhong3HE Shuan-hai1
1.Highway School,Chang'an University,Xi'an 710064,China; 2.Road and Bridge Consultants Co.,Ltd.,Beijing 100000,China; 3.Guangzhou Daguang Highway Co.,Ltd.,Guangzhou 510000,China
关键词:
桥梁工程 曲线部分斜拉桥 特种车 安全系数 塑性铰
Keywords:
bridge engineering extradosed bridge with curve shape special vehicle safety factor plastic hinge
分类号:
U 441
文献标志码:
A
摘要:
为研究曲线部分斜拉桥结构在超载运营时的安全状态,以某双幅部分斜拉桥为背景,采用基于空间结构有限元数值分析并考虑了计入配筋率的钢筋混凝土本构关系的方法,针对挂车-120车辆荷载,分别建立了单辆车、2辆车和3辆车以不同间距的单侧过桥模式,分析了桥梁结构首次出现开裂、截面首次进入塑性状态、单辆车通过时形成塑性铰直至结构形成机构而进入破坏阶段的全过程结构安全系数、索力分布及结构位移状况等主要力学参数,给出了结构受力特征及多辆车过桥时结构的安全系数与车辆间距的关系。研究表明,此桥在单侧通过1至3辆重120 t的挂车荷载时,其保证混凝土不开裂的最小安全系数在2.3以上,车辆沿内幅桥通过时安全系数较高; 结构安全系数与车辆间距大致呈线性关系。曲线部分斜拉桥的破坏模式为加劲梁中跨跨中截面出现塑性铰并不断扩大、主墩底截面相继出现塑性铰而形成机构,最终丧失承载能力。当多辆特种车通过曲线部分斜拉桥时,部分斜拉索的索力可能会达到设计峰值,在运营管理中应给予重视。
Abstract:
In order to study the structural safety status in overload conditions of curve extradosed bridge,a double-amplitude extradosed bridge is analyzed based on FEA numerical methods,considering the effects of reinforced concrete constitutive relation,three unilateral bridge models are designed for single veihicle,double veihicles and triple veihicles with different spacing in Trailer-120 vehicle load.Main mechanical parameters are analyzed,such as first crack appears on bridge structure,cross section first goes into plastic,the safety factor for whole process from plastic hinge formed to the structure forming mechanism and finally stepped into damage stage when single vehicle passing by,cable force distribution and structural displacement.The structure features and the relationship between safety coefficient and vehicle spacing when more veihicles go through the bridge are put forward.The research shows that:firstly,when no more than three veihicles with 120 ton weight go through unilateral bridge,the minimum safety factor of concrete cracks is above 2.3,and safety factor incrases when veihicles passing along the inside of the bridge.Secondly,structure safety factor and vehicle spacing has linear relationship.Finally,structure destruction all happened when plastic hinge appeared and expanded in the midspan and main pier bottom sections in the stiffening beam,then lose the whole bridge bearing capacity.When three special cars go through the curve extradosed bridge,a part of cable force may reach the design peak,which should be given attention in operation management.

参考文献/References:

[1] 韩江水,张 玲,袁 涌.斜拉桥抗震性能评价[J].西安科技大学学报,2013,33(2):131-135. HAN Jiang-shui,ZHANG Ling,YUAN Yong.Evaluation of seismic resistance capacity for cable-stayed bridge[J].Journal of Xi'an University of Science and Technology,2013,33(2):131-135.
[2]田中克弘,北田俊行.弾塑性有限変位解析によるニールセン·ローゼ橋および斜張橋の耐荷力照査法について[C]//鋼構造論文集.东京:日本钢构造协会,2001:39-49. TANAKA Katsuhiro,Tbshiyuki KITADA.Checking method for load carrying capacity of nielsen-lohse bridges and cable-stayed bridges through elasto-plastic and finite displacement analysis[C]//JSSC:Journal of Steel Structures & Construction.Tokyo:Steel Structure Association of Japan,2001:39-49.
[3] Seif S P,Dilger W H.Nonlinear analysis and collapse load of P/C cable-stayed bridges[J].Journal of Structural Engineering,2014,116(3):829-849.
[4] 伏魁先,刘学信.斜拉桥面内整体失稳分析[J].铁道学报,1993,15(4):74-79. FU Kui-xian,LIU Xue-xin.An analysis of cable-stayed bridges on global in-plane instability[J].Journal of Railway Society,1993,15(4):74-79.
[5] Ernst J H,Der E.Modul von seilen unter beruecksichtigung des durchhanges[J].Der Baningenieur,1965,40(2):52-55.
[6] 杨 勇.PC单索面斜拉桥极限承载力分析[D].上海:同济大学,1994. YANG Yong.Ultimate bearing capacity analysis of PC cable-stayed bridges with single plane[D].Shanghai:Tongji University,1994.
[7] 贺拴海,刘志文,宋一凡.斜拉桥的极限承载力分析[J].中国公路学报,2000,13(3):53-57. HE Shuan-hai,LIU Zhi-wen,SONG Yi-fan.Analysis for ultimate load capacity of cable-stayed bridges[J].China Journal of Highway and Transportation,2000,13(3):53-57.
[8] 梁 硕.肋板结构主梁混凝土斜拉桥相关屈曲极限承载力空间分析[J].土木工程学报,2001,34(5):45-51. LIANG Shuo.Three dimensional analysis for local overall interative bucking load[J].China Civil Engineering Jounal,2001,34(5):45-51
[9] 刘 刚.空间扭背索组合梁斜拉桥极限承载力分析[D].西安:长安大学,2010. LIU Gang.Analysis for ultimate bearing capacity of space-twisting cable hybrid girder cable-stayed bridge[D].Xi'an:Chang'an University,2010.
[10]GONG Jin-xin,ZHANG Yan-qing,HAN Shi.Ultimate bearing capacity of reinforced concrete slab carrying concentrated load[J].Journal of Engineering Mechanics,2011,137(12):877-886.
[11]贺拴海.桥梁结构理论与计算方法[M].北京:人民交通出版社,2003. HE Shuan-hai.Bridge structural theory and calculation method[M].Beijing:China Communication Press,2003.
[12]董水英,杨 飞,杨 昀.曲线部分斜拉桥边中跨比及主梁适宜刚度研究[J].公路交通科技,2012(10):71-77. DONG Shui-ying,YANG Fei,YANG Yun.Research of ratio of side span to central span and suitable stiffness of main beam of curved extradosed cable-stayed bridge[J].Journal of Highway and Transportation Research and Development,2012(10):71-77.
[13]刘昊苏,董 军,杨 昀.不同设计参数下曲线矮塔斜拉桥地震响应分析[C]//第21届全国结构工程学术会议论文集第Ⅱ册,2012:258-260. LIU Hao-su,DONG Jun,YANG Yun.Seismic analysis of curve extradosde cable-stayed bridge based on different design parameters[C]//21th National Conference on Structure Engineering,2012:258-260.
[14]杨 飞,杨 昀,王晓雷,等.曲线部分斜拉桥静、动力特性研究[J].公路交通科技:应用技术版,2012(10):166-171. YANG Fei,YANG Yun,Wang Xiao-lei,et al.Static and dynamic analysis of curved extradosed cable-stayed bridge[J].Journal of Highway and Transportation Research and Development:Application Version,2012(10):166-171.
[15]刘 凯.曲线部分斜拉桥的几个设计参数研究[D].西安:长安大学,2013. LIU Kai.Study on several design parameters of curve extradosde cable-stayed bridge[D].Xi'an:Chang'an University,2013.
[16]高 波,邓成刚,王立新,等.曲线部分斜拉桥空间稳定性能研究[J].公路,2014(7):14-21. GAO Bo,DENG Cheng-gang,WANG Li-xin,et al.Space stability study on curve extradosde cable-stayed bridge[J].Highway,2014(7):14-21.
[17]梁 田.曲线矮塔斜拉桥剪力滞效应研究[D].北京:北京建筑大学,2014. LIANG Tian.Study on shear lag effect of curve extradosde cable-stayed bridge[D].Beijing:Beijing University of Civil Engineering and Architecture,2014.
[18]肖荦彪,肖 伟.多塔斜拉桥温度场边界条件数值模拟[J].成都师范学院学报,2013,29(7):118-121. XIAO Luo-biao,XIAO Wei.Numberical simulation on boundary conditions of temperature field in multi-pylons cable stayed bridges[J].Journal of Sichuan College of Education,2013,29(7):118-121.
[19]李宏江,王荣霞,王 磊.在役预应力混凝土斜拉桥的结构状态模拟[J].中外公路,2013,(1):154-158. LI Hong-jiang,WANG Rong-xia,WANG Lei.Simulation on structural state of PC cable-stayed bridges in service[J].Journal of China & Foreign Highway,2013,(1):154-158.
[20]陈玉刚,赵启华,樊启武.黄龙带曲线矮塔斜拉桥主墩及索塔设计[J].四川建筑,2015,35(1):132-134. CHEN Yu-gang,ZHAO Qi-hua,FAN Qi-wu.Main pier and cable tower design of curve extradosde cable-stayed bridge[J].Sichuan Architecture,2015,35(1):132-134.

相似文献/References:

[1]吕聪儒.异形承台大体积混凝土水化热控制模型及跟踪监测[J].西安科技大学学报,2011,(03):297.
 LV Cong-ru.Profiled raft mass concrete hydration heat control model and track monitoring[J].Journal of Xi'an University of Science and Technology,2011,(02):297.
[2]姚玉玲,周往莲.基于流水作业的施工段排序方法[J].西安科技大学学报,2007,(03):509.
 YAO Yu-ling,ZHOU Wang-lian.New approach to building unit scheduling based on flow construction[J].Journal of Xi'an University of Science and Technology,2007,(02):509.

备注/Memo

备注/Memo:
收稿日期:2015-10-22 责任编辑:李克永 基金项目:中国博士后基金项目(2015M572511); 广东省交通运输厅科技项目(科技-2014-02-017); 中央高校基本科研业务费资助项目(310821153306) 通讯作者:王凌波(1984-),女,陕西西安人,工学博士(博士后),副教授,E-mail:Dr.wlb@qq.com
更新日期/Last Update: 1900-01-01