[1]双海清,王红胜,李树刚,等.覆岩采动卸压瓦斯高位钻孔抽采技术[J].西安科技大学学报,2015,(06):682-687.[doi:10.13800/j.cnki.xakjdxxb.2015.0602]
 SHUANG Hai-qing,WANG Hong-sheng,LI Shu-gang,et al.High level borehole drainage technique of the overlying strata mining-induced pressure-relief gas[J].Journal of Xi'an University of Science and Technology,2015,(06):682-687.[doi:10.13800/j.cnki.xakjdxxb.2015.0602]
点击复制

覆岩采动卸压瓦斯高位钻孔抽采技术(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2015年06期
页码:
682-687
栏目:
出版日期:
2015-12-30

文章信息/Info

Title:
High level borehole drainage technique of the overlying strata mining-induced pressure-relief gas
作者:
双海清1王红胜12李树刚12杜政贤1由临东1郭卫彬12
1.西安科技大学 能源学院,陕西 西安 710054; 2.教育部 西部矿井开采及灾害防治重点实验室,陕西 西安 710054
Author(s):
SHUANG Hai-qing1WANG Hong-sheng12LI Shu-gang12 DU Zheng-xian1YOU Lin-dong1GUO Wei-bin12
1.College of Energy Science and Engineering,Xi'an University of Science and Technology,Xi'an 710054,China; 2.Key Laboratory of Western Mine Exploration and Hazard Prevention,Ministry of Education,Xi'an 710054,China
关键词:
低透气性煤层 外错高抽巷 采动裂隙 卸压瓦斯 高位钻孔
Keywords:
low permeability coal seam lateral high drainage roadway mining-induced fissure pressure-relief gas high level borehole
分类号:
TD 712
DOI:
10.13800/j.cnki.xakjdxxb.2015.0602
文献标志码:
A
摘要:
为解决工作面隅角瓦斯超限难题,提出了在外错高抽巷内布置高位钻孔抽采工作面覆岩采动卸压瓦斯方法。针对李雅庄煤矿2-603工作面开采技术条件,建立了高位钻孔围岩结构力学模型,采用理论分析、数值模拟分析及现场实测分析等方法,确定了外错高抽巷内高位钻孔终孔合理位置。首先,覆岩采动裂隙主要分布在上山采动角62°以内,下山采动角65°以内,距离煤层底板13~25 m和38.6~50 m等2个区域,高位钻孔终孔应布置于第二区域内。其次,高位钻孔终孔位于2煤顶板44 m处,采空区内投影长度不小于28 m时,钻孔抽采瓦斯浓度高,且持续抽采时间长。最后,工程应用效果表明,2-603工作面上隅角瓦斯浓度生产班、检修班分别为0.50%~0.95%,0.47%~0.89%,避免了隅角瓦斯超限,保障了工作面安全高效回采。
Abstract:
To solve the problem of the gas consistence exceeding limit at the corner of coalface,a new method that pressure-relief gas in fractured zone of the upper section coalface's overlying strata was extracted by high level boreholes in lateral high drainage roadway was proposed.Based on the mining technology conditions of the No.2-603 coalface of Liyazhuang coal mine,mechanical model of the high level borehole was established,the reasonable final hole position of the high level borehole was determined by theoretical analysis,numerical simulation and field observing analysis.Firstly,the fractured zone was at the height of 13~25 m,38.6~50 m to the floor,and in the rise-entry mining angle of 62°,and in the down-entry mining angle of 65°,and the final location have been layouted at the second zoon.Secondly,the borehole's final hole position was 44 m high over the roof,and the projection length of the borehole was not less than 28 m in the gob,and the value of the gas concentration was high,and the draining time was long.Finally,the engineering application effect showed that the problem of the gas consistence exceeding limit was solved,the gas consistence at the upper corner were 0.50%~0.95% and 0.47%~0.89%,and the coalface was mined safely and effectively.

参考文献/References:

[1] 李树刚.综放开采围岩活动及瓦斯运移[M].徐州:中国矿业大学出版社,2000. LI Shu-gang.Movement of the surrounding rock and gas delivery in fully-mechanized top coal caving[M].Xuzhou:China University of Mining and Technology Press,2000.
[2] 李树刚,钱鸣高.我国煤层与甲烷安全共采技术的可行性[J].科技导报,2000(6):39-41. LI Shu-gang,QIAN Ming-gao.Simultaneous safety extraction of coal and coal-bed methane in China[J].Science & Technology Review,2000(6):39-41.
[3] 程远平,付建华,俞启香.中国煤矿瓦斯抽采技术的发展[J].采矿与安全工程学报,2009,26(2):127-139. CHENG Yuan-ping,FU Jian-hua,YU Qi-xiang.Development of gas extraction technology in coal mines of China[J].Journal of Mining & Safety Engineering,2009,26(2):127-139.
[4] 李树刚,钱鸣高,石平五.综放开采覆岩离层裂隙变化及空隙渗流特性研究[J].岩石力学与工程学报,2000,19(5):604-607. LI Shu-gang,QIAN Ming-gao,SHI Ping-wu.Study on bed-separated fissures of overlying stratum and interstice permeability in fully-mechanized top coal caving[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(5):604-607.
[5] 许家林,钱鸣高,金宏伟.基于岩层移动的“煤与煤层气共采”技术研究[J].煤炭学报,2004,29(2):129-132. XU Jia-lin,QIAN Ming-gao,JIN Hong-wei.Study on“coal and coal-bed methane simultaneous extraction” technique on the basis of strata movement[J].Journal of China Coal Society,2004,29(2):129-132.
[6] 李树刚,李生彩,林海飞,等.卸压瓦斯抽取及煤与瓦斯共采技术研究[J].西安科技大学学报,2002,22(3):247-249. LI Shu-gang,LI Sheng-cai,LIN Hai-fei,et al.Technique of drawing relieved methane and simultaneous extraction of coal and coalbed methane[J].Journal of Xi'an University of Science and Technology,2002,22(3):247-249.
[7] 袁 亮.卸压开采抽采瓦斯理论及煤与瓦斯共采技术体系[J].煤炭学报,2009,34(1):1-8. YUAN Liang.Theory of pressure-relieved gas extraction and technique system of integrated coal production and gas extraction[J].Journal of China Coal Society,2009,34(1):1-8.
[8] 钱鸣高,许家林.覆岩采动裂隙分布的“O”形圈特征研究[J].煤炭学报,1998,23(5):466-469. QIAN Ming-gao,XU Jia-lin.Study on the“O shape”circle distribution characteristics of mining induced fractures in the overlaying strata[J].Journal of China Coal Society,1998,23(5):466-469.
[9]许家林,孟广石.应用上覆岩层采动裂隙“O”形圈特征抽放采空区瓦斯[J].煤矿安全,1995(7):1-3. XU Jia-lin,MENG Guang-shi.Application of overlying rock mining-induced fractures “ O ” ring characteristics of goaf gas drainage[J].Safety in Coal Mines,1995(7):1-3.
[10]李宵尖,姚精明,何富连.高位钻孔瓦斯抽放技术理论与实践[J].煤炭科学技术,2007,35(4):16-17. LI Xiao-jian,YAO Jing-ming,HE Fu-lian.Theory and practices on high level borehole gas drainage technology[J].Coal Science and Technology,2007,35(4):16-17.
[11]朱红青,张民波,王 宁,等.Y型通风高位钻孔抽采被保护层卸压瓦斯研究[J].煤炭科学技术,2013,41(2):56-59. ZHU Hong-qing,ZHANG Min-bo,WANG Ning,et al.Study on pressure released gas drainage in protected seam with high level borehole under Y type ventilation[J].Coal Science and Technology,2013,41(2):56-59.
[12]王耀锋,聂荣山.基于采动裂隙演化特征的高位钻孔优化研究[J].煤炭科学技术,2014,42(6):86-91. WANG Yao-feng,NIE Rong-shan.Study on high level borehole optimization based on evolving characteristics of mining induced fracture[J].Coal Science and Technology,2014,42(6):86-91.
[13]刘桂丽,杨跃奎,撒占友.高位钻孔瓦斯抽采参数优化设计[J].西安科技大学学报,2012,32(4):450-458. LIU Gui-li,YANG Yue-kui,SA Zhan-you.Optimal design of high position boring drainage parameters[J].Journal of Xi'an University of Science & Technology,2012,32(4):450-458.
[14]Itasca Consulting Group Inc.Universal distinct element code[R].Minnesota:Itasca Consulting Group Inc,1996.
[15]娄金福.顶板瓦斯高抽巷采动变形机理及优化布置研究[D].徐州:中国矿业大学矿业工程学院,2008. LOU Jin-fu.Research on the deformation mechanism and the location optimization of high-level entry for gas extraction[D].Xuzhou:China University of Mining & Technology,2008.

备注/Memo

备注/Memo:
基金项目:国家重点基础研究计划(973计划)资助项目(2015CB251600); 国家自然科学青年基金项目(51304156) 通讯作者:双海清(1988-),男,陕西榆林人,博士研究生,E-mail:shuanghaiqing@163.com
更新日期/Last Update: 2015-11-15