[1]奚家米,王明明,徐锋,等.超大断面浅埋隧道施工方法的数值模拟[J].西安科技大学学报,2015,(05):602-610.[doi:10.13800/j.cnki.xakjdxxb.2015.0513]
 XI Jia-mi,WANG Ming-ming,XU Feng,et al.Numerical simulation of construction method for shallow buried large section tunnel[J].Journal of Xi'an University of Science and Technology,2015,(05):602-610.[doi:10.13800/j.cnki.xakjdxxb.2015.0513]
点击复制

超大断面浅埋隧道施工方法的数值模拟(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2015年05期
页码:
602-610
栏目:
出版日期:
2015-10-08

文章信息/Info

Title:
Numerical simulation of construction method for shallow buried large section tunnel
作者:
奚家米1王明明1徐锋2巨龙1朱彬1王亚斌1宁利青1赵望希1
1.西安科技大学 建筑与土木工程学院,陕西 西安 710054; 2.中铁十二局集团第三工程有限公司,山西 太原 030024
Author(s):
XI Jia-mi1WANG Ming-ming1XU Feng2JU Long1 ZHU Bin1WANG Ya-bin1NING Li-qing1ZHAO Wang-xi1
1College of Civil and Architectural Engineering,Xi'an University of Science and Technology,Xi'an 710054,China; 2.China Railway Bureau Group Third Engineering Co.,Ltd.,Taiyuan 030024,China
关键词:
数值模拟 施工方法 双侧壁导坑法 超大断面隧道
Keywords:
numerical simulation construction method two side-wall pilot tunnel method large section tunnel
分类号:
TU 93
DOI:
10.13800/j.cnki.xakjdxxb.2015.0513
文献标志码:
A
摘要:
以西成铁路客运专线得利隧道为工程背景,为合理选择超大断面隧道施工方案,使用ANSYS软件对该隧道B型断面进行了二维分步开挖模拟,分析了不同施工方法下隧道围岩及衬砌的应力和变形情况。根据西成铁路客运专线得利隧道的工程地质条件,分别探讨了台阶法施工和双侧壁导坑法施工工况下隧道衬砌的受力和变形情况。分析表明双侧壁导坑法施工引起的地层沉降小于台阶法施工引起的地层沉降,因而双侧壁导坑法施工的安全性高于台阶法施工。其中台阶法开挖的关键是上部开挖,双侧壁导坑法开挖的关键是核心土上部开挖。在隧道具体施工过程中,必须对这些重点部位加强监控量测,及时支护,确保隧道安全施工。
Abstract:
The background of this paper is Xian to Chengdu's railway passenger special line tunnel.For the comparison and optimization of this large cross section tunnel project under different construction method,General FEA software ANSYS is used to simulate and analyze the mechanics and deformation in 2-D.According to the Deli tunnel engineering case,mechanical properties and deformation characteristics for the construction of bench cut method and two side-wall pilot tunnel method have been elaborated.From this simulation,we made the conclusion for different mechanical properties and deformation characteristics in different construction methods.It shows that the strata subsidence caused by two side-wall pilot tunnel method is less than the bench cut method,so it is more safer using two side-wall pilot tunnel method.The key step for bench cut method is the upper excavation,the key step for two side-wall pilot tunnel method is the upper core soil excavation.To guarantee the smooth construction,monitor and support of these key areas must be enhanced and stable controlled in the construction process.

参考文献/References:

[1] 周丁恒,曲海锋.特大断面大跨度隧道围岩变形的现场试验研究[J].岩石力学与工程学报,2009,28(9):1 773-1 782. ZHOU Ding-heng,QU Hai-feng.Insite test on surrounding rock deformation in super-large section and large-span tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(9):1 773-1 782.
[2] Gioda G,Swoboda G.Developments and applications of the numerical analysis of tunnels in continuous media[J].International Journal for Numerical and Analytical Methods in Geomechanics,1999,23(13):1 393-1 405.
[3] Swoboda G,Abu-Krisha A.Three-dimensional numerical modelling for TBM tunnelling in consolidated clay[J].Tunnelling and Underground Space Technology,1999,14(3):323-333.
[4] Eberhartdt E.Numerical modeling of three-dimension stress rotation ahead of an advancing tunnel face[J].Rock Mechanics and Mining Sciences,2001(38):499-518.
[5] 吴崔鹏.大断面隧道施工过程数值分析[D].西安:长安大学,2009. WU Cui-peng.Numerical analysis of large cross-section tunnel[D].Xi'an:Chang'an University,2009.
[6] 喻 渝,赵东平,曾满元,等.客运专线超大断面隧道施工过程三维力学分析[J].现代隧道技术,2005,42(4):20-24. YU Yu,ZHAO Dong-ping,ZENG Man-yuan,et al.Analysis of the 3D behavior of tunnels with super large cross-section on special lines for passengers during construction[J].Modern Tunnelling Technology,2005,42(4):20-24.
[7] 高 峰,谭绪凯.双侧壁导坑法施工的大断面隧道的稳定性分析[J].重庆交通大学学报,2010,29(3):363-440. GAO Feng,TAN Xu-kai.Stability analysis on large section tunnel with double-side-drift method[J].Journal of Chongqing Jiaotong University,2010,29(3):363-440.
[8] 杨建华,朱 彬.大跨度软岩隧道开挖方法及施工方案数值模拟研究[J].西安科技大学学报,2011,31(3):287-292. YANG Jian-hua,ZHU Bin.Construction of long span and soft rock tunnel with numerical simulation[J].Journal of Xi'an University of Science and Technology,2011,31(3):287-292.
[9] 刘德平,王彩勤.软岩双连拱隧道施工模拟与力学分析[J].西安科技大学学报,2010,30(6):672-676. LIU De-ping,WANG Cai-qin.Soft Yanshuanglian arch tunnel construction simulation and mechanical analysis[J].Journal of Xi'an University of Science and Technology,2010,30(6):672-676.
[10]余存鹏.明垭子软岩隧道围岩稳定性评价[J].西安科技大学学报,2012,32(6):707-711. YU Cun-peng.Ming Yazi soft rock tunnel surrounding rock stability evaluation[J].Journal of Xi'an University of Science and Technology,2012,32(6):707-711.
[11]操太林.双侧壁导坑法在隧道特殊段施工中的应用[J].华东公路,1997(1):57-59. CAO Tai-lin.The implication of two-slide wall tunnel method in special tunnel construction[J].East China Highway,1997(1):57-59.
[12]王 志,杜守继,张文波,等.浅埋铁路隧道下穿高速公路施工沉降分析[J].地下空间与工程学报,2009,5(3):531-535. WANG Zhi,DU Shou-ji,ZHANG Wen-bo,et al.Analysis of construction settlement of shallow railway tunnel under crossing the highway[J].Chinese Journal of Underground Space and Engineering,2009,5(3):531-535.
[13]奚正兵,焦 苍,王连山,等.超大断面隧道不同工法引起软弱围岩变形机理分析[J].施工技术,2006,35(增):50-51,68. XI Zheng-bing,JIAO Cang,WANG Lian-shan,et al.Analysis of characteristic of soft surrounding rock deformation for super large section tunnel excavation[J].Construction Technology,2006,35(suppl.):50-51,68.
[14]TB-10204,铁路隧道施工规范[S].北京:中国铁道出版社,2002. TB-10204,Railway tunnel construction specifications[S].Beijing:China Railway Press,2002.
[15]李 围.隧道及地下工程ANSYS实例分析[M].北京:中国水利水电出版社,2008. LI Wei.Ansys analysis example for tunnel and underground engineering[M].Beijing:China Water Conservancy and Hydropower Press,2008.

相似文献/References:

[1]李英强,袁瑞甫.复杂地质条件下炮采工作面超前支承压力的研究[J].西安科技大学学报,2014,(01):16.
 LI Ying-qiang,YUAN Rui-fu.Advancing abutment pressure in blasting mining face under complicated geological conditions[J].Journal of Xi'an University of Science and Technology,2014,(05):16.
[2]王亚超,罗振敏,肖 旸,等.基于FLUENT的含硫天然气泄漏数值模拟研究[J].西安科技大学学报,2016,(04):484.[doi:10.13800/j.cnki.xakjdxxb.2016.0406]
 WANG Ya-chao,LUO Zhen-min,XIAO Yang,et al.Numerical simulation for the leakage of natural gas with sulfur based on FLUENT software[J].Journal of Xi'an University of Science and Technology,2016,(05):484.[doi:10.13800/j.cnki.xakjdxxb.2016.0406]
[3]李金奎,熊振华,刘东生,等.钻孔卸压防治巷道冲击地压的数值模拟[J].西安科技大学学报,2009,(04):424.[doi:10.13800/j.cnki.xakjdxxb.2009.04.010]
[4]于远祥,谷拴成,韩荣刚,等.隧道开挖对临近墩基础承载力影响的数值模拟[J].西安科技大学学报,2009,(04):427.[doi:10.13800/j.cnki.xakjdxxb.2009.04.018]
[5]王松阳,李树刚,王红胜.水渗流对薄层复合顶板的弱化影响[J].西安科技大学学报,2012,(06):686.
 WANG Song-yang,LI Shu-gang,WANG Hong-sheng.Weaken influence of water seepage onthin-layer compound roof[J].Journal of Xi'an University of Science and Technology,2012,(05):686.
[6]陈拓其,张玉涛,刘宇睿,等.基于FDS的不同排烟模式下餐馆火灾数值模拟[J].西安科技大学学报,2018,(06):893.[doi:10.13800/j.cnki.xakjdxxb.2018.0604]
 CHEN Tuo-qi,ZHANG Yu-tao,LIU Yu-rui,et al.Numerical simulation of restaurant fire under different smokeexhaust modes based on FDS[J].Journal of Xi'an University of Science and Technology,2018,(05):893.[doi:10.13800/j.cnki.xakjdxxb.2018.0604]
[7]杨春丽,刘 琦,杨春燕.独头巷道内瓦斯运移规律数值模拟[J].西安科技大学学报,2011,(06):728.
 YANG Chun-li,LIU Qi,YANG Chun-yan.Numerical simulation of gas migration law in blind roadway[J].Journal of Xi'an University of Science and Technology,2011,(05):728.
[8]邓博团,苏三庆,任建喜,等.秦巴山区某软岩公路隧道合理施工方法研究[J].西安科技大学学报,2016,(01):92.
 DENG Bo-tuan,SU San-qing,REN Jian-xi,et al.Reasonable methods of constructing highwaysoft-rock tunnel in Qinba mountains[J].Journal of Xi'an University of Science and Technology,2016,(05):92.

备注/Memo

备注/Memo:
基金项目:陕西省自然科学基金项目(2011JM5002); 陕西省教育厅科研计划项目(07JK321) 通讯作者:奚家米(1974-),男,安徽芜湖人,教授,E-mail:xijm@xust.edu.cn
更新日期/Last Update: 2015-09-15