[1]丁国峰,王苏健,谢文兵,等.加固顶板和两帮控制回采巷道底臌研究[J].西安科技大学学报,2014,(04):384-389.[doi:10.13800/j.cnki.xakjdxxb.2014.0402]
 DING Guo-feng,WANG Su-jian,XIE Wen-bing,et al.Mechanism of reinforcing roof and sides for floor heave control of roadway[J].Journal of Xi'an University of Science and Technology,2014,(04):384-389.[doi:10.13800/j.cnki.xakjdxxb.2014.0402]
点击复制

加固顶板和两帮控制回采巷道底臌研究(/HTML)
分享到:

西安科技大学学报[ISSN:1672-9315/CN:61-1434/N]

卷:
期数:
2014年04期
页码:
384-389
栏目:
出版日期:
2014-08-31

文章信息/Info

Title:
Mechanism of reinforcing roof and sides for floor heave control of roadway
作者:
丁国峰1王苏健1谢文兵2邓增社1王其洲2
1.中国矿业大学 矿业工程学院,江苏 徐州 221116; 2.中国矿业大学 煤炭资源与安全开采国家重点实验室,江苏 徐州 221116
Author(s):
DING Guo-feng1 WANG Su-jian1XIE Wen-bing2 DENG Zeng-she1 Wang Qi-zhou2
1.School of Mine Engineering,China University of Mining and Technology,Xuzhou 221116,China; 2.State Key Lab for Coal Resources & Safe Mining,China University of Mining and Technology,Xuzhou 221116,China
关键词:
回采巷道 底鼓 数值模拟 加固顶板和两帮
Keywords:
floor heave numerical simulation reinforcing roof and sides
分类号:
TD 353
DOI:
10.13800/j.cnki.xakjdxxb.2014.0402
文献标志码:
A
摘要:
回采巷道围岩是由顶板、两帮和底板共同组成的复合结构体,各部位的岩体强度、应力状态及变形破坏等特性方面的差异显著,尤其受采动影响后,巷道围岩各部位变形发展不均匀性显著,往往造成巷道围岩产生结构性失稳破坏。为提高巷道围岩的结构稳定性,通过理论分析和数值模拟分析了提高顶板和两帮强度对底板岩层稳定性的影响。研究结果表明:加固顶板减小了顶板挠曲位移量,同时可以促使围岩应力向深部围岩转移,降低了底板岩层的应力集中程度,有利于控制底板变形; 加固两帮可以提高巷道两帮围岩强度,促使应力向两帮转移,有利于减小发生底鼓的底板岩层宽度和两帮移近量,从而减小底板的挠曲效应和压曲效应。分析结果还表明,加强两帮对于减小底鼓量的效果更为明显。在上述分析的基础上,进行了加固顶板和两帮控制巷道底鼓支护技术的现场工业性试验,试验结果表明加固顶板和两帮可有效地控制巷道底鼓。
Abstract:
The surrounding rock of roadway is a composite structure consisted of roof,sides and floor.Rock mass strength,stress state and deformation failure characteristic of various parts of the surrounding rock are significant differences.Particularly,the various parts deformation of surrounding rock of roadway shows Non-uniform development.This always caused by a structural instability failure of surrounding rock.In order to improve the structural stability of surrounding rock,through the theoretic analysis and numerical simulation,the stability of floor affection by roof and sides is discussed.The results showed that: reinforced roof can decrease its flexure displacement and promote surrounding rock stress transfer to the deep rock,reducing the floor stress concentration is conducive to floor heave control; reinforced sides help to improve its strength,impel stress transfer to sides, contribute to reduce the rib sides convergence and width of floor occurred vertical displacement,thereby reducing flexural effect and press effect of floor.The results also show that reinforeing sides is more effective than roof.This theory is applied to the technology of control floor heave by reinforcing roof and sides.Field testing and monitoring shows that the large-scale deformation and floor heave are successfully controlled.

参考文献/References:

[1] 何满潮,谢和平,彭苏萍,等.深部开采岩体力学研究[J].岩石力学与工程学报,2005,24(16):2 803-2 813. HE Man-chao,XIE He-ping,PENG Su-ping,et al.Study on rock mechanics in deep mining engineering[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(16):2 803-2 813.
[2] 陈炎光,陆士良.中国煤矿巷道围岩控制[M].徐州:中国矿业大学出版社,1994. CHEN Yan-guang,LU Shi-liang.Strata control around coal mine roadways in China[M].Xuzhou:China University of Mining and Technology Press,1994.
[3] 陈登红,华心祝,李英明,等.回采巷道围岩分类治理模式及关键技术研究[J].岩石力学与工程学报,2012,31(11):2 240-2 247. CHEN Deng-hong,HUA Xin-zhu,LI Ying-ming,et al.Study of key technologies and management modes for classifying surrounding rocks of gateway[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(11):2 240-2 247.
[4] 王卫军,侯朝炯.回采巷道底臌力学原理及控制研究新进展[J].湘潭矿业学院学报,2003,18(1):1-6. WANG Wei-jun,HOU Chao-jiong.New development of mechanism and control technique study of extraction opening floor heave[J].Journal of Xiangtan Mining Institute,2003,18(1):1-6.
[5] 王卫军,冯 涛.加固两帮控制深井巷道底鼓的机理研究[J].岩石力学与工程学报,2005,24(5):808-811. WANG Wei-jun,FENG Tao.Study on mechanism of reinforcing sides to control floor heave of extraction opening[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(5):808-811.
[6] 侯朝炯,何亚男,李 晓,等.加固巷道帮、角控制底臌的研究[J].岩石力学与工程学报,1995,20(3):229-234. HOU Chao-jiong,HE Ya-nan,LI Xiao,et al.Reinforcing sidewalls and corners of gateway to control floor heave[J].Journal of China Coal Society,1995,20(3):229-234.
[7] 李学华,王卫军,侯朝炯.加固顶板控制巷道底鼓的数值模拟[J].中国矿业大学学报,2003,32(4):436-439. LI Xue-hua,WANG Wei-jun,HOU Chao-jiong.Controlling floor heave with strengthening roof in gateway by numerical analysis[J].Journal of China University of Mining and Technology,2003,32(4):436-439.
[8] 姜耀东,赵毅鑫,刘文岗,等.深部开采中巷道底鼓问题的研究[J].岩石力学与工程学报,2004,23(14):2 396-2 401. JIANG Yao-dong,ZHAO Yi-xin,LIU Wen-gang,et al.Research on floor heave of roadway in deep mining[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(14):2 396-2 401.
[9] 康红普,陆士良.巷道底臌的挠曲效应及卸压效果的分析[J].煤炭学报,1992(1):37-52. KANG Hong-pu,LU Shi-liang.Analysis of floor heave in roadway due to deflecting and distressing effects[J].Journal of China Coal Society,1992(1):37-52.
[10]康红普.软岩巷道底臌的机理及防治[M].北京:煤炭工业出版社,1993. KANG Hong-pu. Floor heave mechanism and control of soft roadway[M].Beijing:China Coal Industry Publishing House,1993.
[11]马念杰,侯朝炯.采准巷道矿压理论及应用[M].北京:煤炭工业出版社,1995. MA Nian-jie,HOU Chao-jiong.The underground pressure of sectional roadways and its control[M].Beijing: China Coal Industry Press,1995.
[12]康红普.软岩巷道和硐室的底臌机理及卸压技术的研究[D].徐州:中国矿业大学1991. KANG Hong-pu.Research on mechanism of floor heave of soft rock tunnel and roadway and pressure relief technology[D].Xuzhou:China University of Mining and Technology,1991.
[13]姜耀东,陆士良.巷道底臌机理的研究[J].煤炭学报,1994,19(4):343-351. JIANG Yao-dong,LU Shi-liang.Investigation of mechanism of floor heave of roadway[J].Journal of China Coal Society,1994,19(4):343-351.
[14]姜耀东.巷道底臌机理及其控制措施的研究[D].徐州:中国矿业大学,1993. JIANG Yao-dong.Study on mechanism of floor heave and its control measures[D].Xuzhou:China University of Mining and Technology,1993.

相似文献/References:

[1]文志杰,曹建军,张 彬.回采巷道基本顶结构建立及其力学稳定性分析[J].西安科技大学学报,2009,(06):672.
 WEN Zhi-jie,CAO Jian-jun,ZHANG Bin.The roadway deformation mechanism and establishment of mechanical model of thick seam[J].Journal of Xi'an University of Science and Technology,2009,(04):672.
[2]黄庆享,郝高全.回采巷道底板破坏范围及其影响研究[J].西安科技大学学报,2018,(01):51.[doi:10.13800/j.cnki.xakjdxxb.2018.0108]
 HUANG Qing-xiang,HAO Gao-quan.Research on the floor failure range and its effects of entry[J].Journal of Xi'an University of Science and Technology,2018,(04):51.[doi:10.13800/j.cnki.xakjdxxb.2018.0108]
[3]闫光准,杨相海.崔家沟软岩巷道变形破坏机理及支护研究[J].西安科技大学学报,2010,(05):548.
 YAN Guang-zhun,YANG Xiang-hai.Support and deformation failure mechanism of soft rock roadway in Cuijiagou coal mine[J].Journal of Xi'an University of Science and Technology,2010,(04):548.
[4]王 蓬,马志鹏.复杂条件下厚煤层回采巷道围岩动态变形规律研究[J].西安科技大学学报,2010,(05):613.
 WANG Peng,MA Zhi-peng.Dynamic deformation law of surrounding rock of mining roadway in complex thick coal seam[J].Journal of Xi'an University of Science and Technology,2010,(04):613.

备注/Memo

备注/Memo:
基金项目:煤炭资源与安全开采国家重点实验室自主研究课题基金资助项目(SKLCRSM08X01) 通讯作者:丁国峰(1989-),男,河南新乡人,硕士研究生,E-mail:cumtdgf@163.com