Capacitive current calculation methods of 10 kV power system in coal mine Click Copy

Capacitive current calculation methods of 10 kV power system in coal mine

References:

[1] 段 练,杜高鑫.任楼煤矿电容电流危害分析与治理研究[J].工矿自动化,2011,1(1):101-102. DUAN Lian,DU Gao-xin.Research of harm analysis of capacitance current of Renlou coal mine and its treatment[J].Industry and Mine Automation,2011,1(1):101-102.
[2] 李 璐.矿井电网电容电流测量方法的研究[D].西安:西安科技大学,2013. LI Lu.Research on methods to measure capacitive current in coal mine[D].Xi'an:Xi'an University of Science and Technology,2013.
[3] 许 丹,马星河.煤矿高压电网对地电容电流测算分析[J].煤矿机电,2012,2(4):24-25. XU Dan,MA Xing-he.Analysis of measurement and calculation for coal mine high voltage grid grounding capacitance current[J].Colliery Mechanical & Electrical Technology,2012,2(4):24-25.
[4] 张 炜.中性点不接地系统电容电流测量方法的研究[D].西安:西安科技大学,2012. ZHANG Wei.Research on methods to measure capacitive current in Non-ground neutral system[D].Xi'an:Xi'an University of Science and Technology,2012.
[5] 钟新华.配电网电容电流估算公式的修正[J].电力建设,2004,25(5):23-26. ZHONG Xin-hua.Correction of estimating formula for capacitance current of distribution network[J].Electric Power Construction,2004,25(5):23-26.
[6] 国家安全生产监督管理总局.煤矿安全规程[M].北京:煤炭工业出版社,2011. State Administration of Work Safety.Safety regulations in coal mine[M].Beijing:China Coal Industry Publishing House,2011.
[7] 国家质检总局,GB50070-2009,矿山电力设计规范[S].北京:中国计划出版社,2009. National Bureau of Quality Inspection,GB50070-2009,Code for design of electric power in mine[S].Beijing:China Planing Press,2009.
[8] 李景禄.实用配电网技术[M].北京:中国水利水电出版社,2006. LI Jing-lu.Practical distribution network technology[M].Beijing:China Water & Power Press,2006.
[9] 逍 遥.配电网电容电流影响及补偿研究[D].郑州:郑州大学,2014. XIAO Yao.Study of distribution capacitance current effect and compensation[D].Zhengzhou:Zhengzhou University,2014.
[10]冉启鹏.配网系统容性电流的理论校验[J].南方电网技术,2012,6(5):68-71. RAN Qi-peng.The theoretical checkout of capacitive current in distribution networks[J].Southern Power System Technology,2012,6(5):68-71.
[11]候光磊.义马煤业集团高压配电网电容电流的测量与防治[D].焦作:河南理工大学,2011. HOU Guang-lei.Measure and control high voltage distribution network capacitive current of Yima Coal Industry Group[D].Jiaozuo:Henan Polytechnic University,2011.
[12]电力标准(DL),DL/T308-2012,中性点不接地系统电容电流测试规程[S].北京:中国电力出版社,2012. Electricity Standard(DL),DL/T308-2012,Code of me-asuring capacitive current in neutral point isolated system[S].Beijing:China Electric Power Press,2012.
[13]孔祥晖,刘宝涛.煤矿高压电网电容电流测量方案的研究[J].煤,2010,19(6):24-26. KONG Xiang-hui,LIU Bao-tao.A new design of measurement device of capacitive current in coal mine High-voltage power network[J].Coal,2010,19(6):24-26.
[14]孙引忠,师丽霞,李志奇,等.煤矿6 /10 kV电网电容电流测量算法的分析与研究[J].煤炭技术,2015,34(1):279-280. SUN Yin-zhong,SHI Li-xia,LI Zhi-qi,et al.Analysis and research of capacitive current measurement algorithm about coal mine 6 /10 KV grid[J].Coal Technology,2015,34(1):279-280.
[15]孙 旺.中压电网容性电流测试方法研究[D].西安:西安科技大学,2014. SUN Wang.Research of testing methods of capacitive cuurent for medium voltage grid[D].Xi'an:Xi'an University of Science and Technology,2014.

Memo

收稿日期:2015-10-20 责任编辑:高 佳 通讯作者:张红涛(1989-),男,陕西咸阳人,硕士研究生,E-mail:623558729@qq.com