Cross-layer stress shell mechanical model of water-inrush from coal seam floor Click Copy

Cross-layer stress shell mechanical model of water-inrush from coal seam floor

References:

[1] 施龙青.底板突水机理研究综述[J].山东科技大学学报,2009,28(3):17-23.
SHI Long-qing.Summary of research on mechanism of water inrush from seam floor[J]. Journal of Shandong University of Science and Technology, 2009,28(3):17-23.
[2] 荆自刚.峰峰二矿开采活动与底板突水关系研究[J].煤炭学报,1984,9(2):20-23.
JING Zi-gang. Study of the relationship between water-inrush from floor and mining activities in Fengfeng No.2 coal mine[J].Journal of China Coal Society,1984,9(2):20-23.
[3] 王作宇,刘鸿泉.承压水上采煤[M].北京:煤炭工业出版社,1992.
WANG Zuo-yu,LIU Hong-quan.Coal mining above the confined aquifers[M]. Beijing: Publisher of China Coal Industry, 1992.
[4] 王经明.承压水沿煤层底板递进导升突水机理的模拟与观测[J].岩土工程学报,1999,21(5):546-549.
WANG Jing-ming.In-situ measurement and physical analogue on water inrush from coal floor induced by progressive intrusion of artesian water into protective aquiclude[J].Chinese Journal of Geotechnical Engineering,1999,21(5):546-549.

Memo

基金项目: 国家自然科学基金项目(51174156; 51174278); 陕西省科技厅社发攻关项目(2010K11-02-08); 榆林市产学研合作项目(榆政财教发[2010]4号); 陕西省教育厅重点实验室研究计划项目(2010JS019) 通讯作者: 张文忠(1980-),男,河南信阳人,博士,助理研究员,主要从事采矿岩层控制及矿井防治水方面的研究工作.