Stability analysis for excavated section of shield tunnel Click Copy

Stability analysis for excavated section of shield tunnel

References:

[1] Mair R J, Taylor R N, O'Reilly M P. Ground movements around shallow tunnels in Soft Clay[M]. 12th ICSMFE, Brazil,1989.
[2] 韩晓雷.非饱和沙漠地基土的理论和工程应用研究[D].西安:西安建筑科技大学,2004.
HAN Xiao-lei.Research on the theory and engineering practice about unsaturated desert subsoil[D].Xi'an: Xi'an University of Architecture and Technology,2004.
[3] 贺永年,刘志强.隧道工程[M].徐州:中国矿业大学出版社,2002.
HE Yong-nian,LIU Zhi-qiang.Tunnel Engineering[M].Xuzhou:China Unversity of Mining and Technology Press,2002.
[4] 陈旅毅.遗传算法在土坡稳定优化问题中的应用[J].福州建筑,2002,80:32-34.
CHEN Lu-yi. Application of genetic algorithms on stability optimum problems of earth slopes[J]. Fuzhou Architecture & Construction,2002,80:32-34.
[5] 高 涛,毛巨省,罗建峰,等.SLOPE/W程序在土质边坡稳定性分析中的应用[J].西安科技大学学报,2006,26(2):184-188.
GAO Tao,MAO Ju-xing,LUO Jian-feng,et el.Application of SLOPE/W in the stability analysis of soil slope[J].Journal of Xi'an University of Science and Technology,2006,26(2):184-188.
[6] 梁晓丹,宋宏伟,刘 刚,等. 地下工程对地面既有高层建筑影响的数值分析[J].西安科技大学学报,2006,26(1):48-50.
LIANG Xiao-dan,SONG Hong-wei,LIU Gang, et al. Numerical analysis of underground excavation effects on a high-rise building on the ground surface[J].Journal of Xi'an University of Science and Technology, 2006,26(1):48-50.
[7] 刁良勋. 既有盾构隧道条件下明挖地铁车站施工的三维数值模拟[J].西安科技大学学报,2007,27(3):372-376.
DIAO Liang-xun. Three dimensional numerical simulation of construction of metro-station existing shield tunnel using open surface method[J].Journal of Xi'an University of Science and Technology, 2007,27(3):372-376.

Memo

收稿日期: 2008-09-18 基金项目: 高等学校博士点基金(20070704001); 西安科技大学培育基金(A515080) 作者简介: 郅 彬(1972-),男,陕西西安人,博士生,主要从事黄土力学的教学和研究工作.