Numerical simulation of jet grouting piles reinforcement in loess tunnel basement and inverted arch Click Copy

Numerical simulation of jet grouting piles reinforcement in loess tunnel basement and inverted arch

References:

[1] 王亚琼,谢永利,晏长根.黄土公路隧道病害治理实例研究[J].工程地质学报,2008,16(4):557-562. WANG Ya-qiong,XIE Yong-li,YAN Chang-gen.Detection and treatment of road tunnel distresses in loess:a case study[J].Journal of Engineering Geology,2008,16(4):557-562. [2] 杨碧峰,杨晓华.超长旋喷桩在黄土隧道软基加固中的应用[J].公路交通科技:应用技术版,2007(5):17-19. YANG Bi-feng,YANG Xiao-hua.Application of very long jet grouting piles in soft soil foundation reinforcement of loess tunnels[J].Road Traffic Technology:Application Technology Edition,2007(5):17-19. [3] 邵生俊,杨春鸣,焦阳阳,等.湿陷性黄土隧道的工程性质分析[J].岩土工程学报,2013,35(9):1580-1590. SHAO Sheng-jun,YANG Chun-ming,JIAO Yang-yang,et al.Engineering properties of collapsible loess tunnel[J].Chinese Journal of Geotechnical Engineering,2013,35(9):1580-1590. [4] 李小杰.高压旋喷桩复合地基承载力与沉降计算方法分析[J].岩土力学,2004,25(9):1499-1502. LI Xiao-jie.Analysis of calculation methods for bearing capacity and settlement of high-pressure chemical churning pile composite foundation[J].Rock and Soil Mechanics,2004,25(9):1499-1502. [5] 王新东.郑西铁路客运专线湿陷性黄土隧道基底处理技术[J].铁道标准设计,2007(S1):90-92. WANG Xin-dong.Foundation treatment technology of collapsible loess tunnel in Zhengxi Railway Passenger Dedicated Line[J].Railway Standard Design,2007(S1):90-92. [6] 郭 军,王明年,李 宁,等.大断面黄土隧道地基处理的沉降计算分析与讨论[J].铁道建筑,2007,47(4):81-83. GUO Jun,WANG Ming-nian,LI Ning,et al.Settlement analysis and discussion on foundation treatment of large section loess tunnel[J].Railway Engineering,2007,47(4):81-83. [7] 田冲冲,沈亚斌.隧底竖直旋喷桩数值模拟分析[J].公路,2015,60(6):273-275. TIAN Chong-chong.Numerical simulation analysis of vertical jet grouting pile in tunnel[J].Highway,2015,60(6):273-275. [8] Mair J R,Soga K.,Wongsaroj J.Tunnelling-induced consolidation settlement in London clay[J].Geotechnique,2013,63(13):1103-1115. [9]Swoboda G,Abukrisha A.Three-dimensional numerical modeling for TBM tunneling in consolidated clay[J].Tunneling and Underground Space Technology,1999,14(3):327-333. [10]Marcio Munizde Farias,Alvaro Henrique Moraes Junior.Andre pacheco de assis displacement control in tunnels excavated by the NATM:3D numerical simulations[J].Tunnelling and Underground Space Technology,2004(19):283-293. [11]李 烨,许崇帮.大酉山隧道围岩长期变形分析[J].公路交通科技,2013,30(12):120-124. LI Ye,XU Chong-bang.Analysis of long-term deformation of tunnel surrounding rock of Dayoushan Tunnel[J].Journal of Highway and Transportation Research and Development,2013,30(12):120-124. [12]赖金星,樊浩博,来弘鹏,等.软弱黄土隧道变形规律现场测试与分析[J].岩土力学,2015,36(7):2003-2012. LAI Jin-xing,FAN Hao-bo,LAI Hong-peng,et al.In-situ monitoring and analysis of tunnel deformation law in weak loess[J].Rock and Soil Mechanics,2015,36(7):2003-2012. [13]樊浩博.软弱黄土隧道隧底受力变形特征与沉降控制研究[D].西安:长安大学,2014. FAN Hao-bo.Study on the bottom stress and deformation characteristics and settlement control of soft loess tunnel[D].Xi'an:Chang'an University,2014. [14]赖金星,樊浩博,谢永利,等.旋喷桩加固黄土隧道地基固结分析[J].长安大学学报:自然科学版,2016,36(2):73-79. LAI Jin-xing,FAN Hao-bo,XIE Yong-li,et al Consolidation analysis of jet grouting pile reinforcement in loess tunnel[J].Journal of Chang'an University:Natural Science Edition,2016,36(2):73-79.

Memo

收稿日期:2018-01-10 责任编辑:李克永
基金项目:国家自然科学基金(41702287)
通信作者:陈国龙(1970-),男,陕西汉中人,高级工程师,E-mail: 424689213@qq.com