Overburdern movement and monitoring of gob-side entry retaining in fully mechanized caving face Click Copy

Overburdern movement and monitoring of gob-side entry retaining in fully mechanized caving face

References:

[1] 张 农,韩昌良,阚甲广,等.沿空留巷围岩控制理论与实践[J].煤炭学报,2014(8):1635-1641. ZHANG Nong,HANG Chang-liang,KAN Jia-guang,et al.Theory and practice of surrounding rock control for pillarless gob-side entry retaining[J].Journal of China Coal Society,2014,39(8):1635-1641.
[2]陈 勇.沿空留巷围岩结构运动稳定机理与控制研究[D].北京:中国矿业大学,2012. CHEN Yong.Research on control and mechanism of movement of surrounding rock of road along gob-side[D].Beijing:China University of Mining and Technology,2012.
[3]张东升,茅献彪,马文顶.综放沿空留巷围岩变形特征的试验研究[J].岩石力学与工程学报,2002,21(3):331-334. ZHANG Dong-sheng,MAO Xian-biao,MA Wen-ding.Testing study on deformation features of surrounding rocks of gob-side entry retaining in fully-mechanized coal face with top-coal caving[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(3):331-334.
[4]漆泰岳,郭育光,侯朝炯.沿空留巷整体浇注护巷带适应性研究[J].煤炭学报,1999,24(3):256-260. QI Tai-yue,GUO Yu-guang,HOU Chao-jiong.Study on the adaptability for the pack-fillings of the gob-side entry re-taming[J].Journal of China Coal Society,1999,24(3):256-260.
[5]潘一山,肖永惠,李忠华,等.冲击地压矿井巷道支护理论研究及应用[J].煤炭学报,2014(2):222-228. PAN Yi-shan,XIAO Yong-hui,LI Zhong-hua,et al.Study of tunnel support theory of rockburst in coal mine and its application[J].Journal of China Coal Society,2014,39(2); 222-228.
[6]刘洪涛,王 飞,王广辉,等.大变形巷道顶板可接长锚杆支护系统性能研究[J].煤炭学报,2014,39(4):600-607. LIU Hong-tao,WANG Fei,WANG Guang-hui,et al.On the performance of lengthened bolt coupling support system in roadway roof[J].Journal of China Coal Society,2014,39(4):600-607.
[7]张 农,张志义,吴 海,等.深井沿空留巷扩刷修复技术及应用[J].岩石力学与工程学报,2014,33(3):468-474. ZHANG Nong,ZHANG Zhi-yi,WU Hai,et al.Technology and application of reparation in deep gob-side entry retaining[J].Chinese Journal of Rock Mechanics and Engineering,2014,33(3):468-474.
[8]朱川曲,张道兵,施式亮,等.综放沿空留巷支护结构的可靠性分析[J].煤炭学报,2006(2):141-144. ZHU Chuan-qu,ZHANG Dao-bing,SHI Shi-liang,et al.Reliability analysis on support structure of gob-side entry retaining in fully-mechanized caving face[J].Journal of China Coal Society,2006,31(2):141-144.
[9]华心祝,刘 淑,刘增辉,等.孤岛工作面沿空掘巷矿压特征研究及工程应用[J].岩石力学与工程学报,2011,30(8):1646-1651. HUA Xin-zhu,LIU Shu,LIU Zeng-hui,et al.Research onstrata pressure characteristic of gob-side entry driving in island mining face and its engineering application[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(8):1646-1651.
[10]黄艳利,张吉雄,巨 峰.巷旁充填沿空留巷技术及矿压显现规律[J].西安科技大学学报,2009,29(5):515-520. HUANG Yan-li,ZHANG Ji-xiong,JU Feng.Technology of roadside packing in gob-side entry retaining and law of rock pressure[J].Journal of Xi'an University of Science and Technology,2009,29(5):515-520.
[11]康红普,牛多龙,张 镇,等.深部沿空留巷围岩变形特征与支护技术[J].岩石力学与工程学报,2010,29(10):1977-1987. KANG Hong-pu,NIU Duo-long,ZHANG Zhen,et al.Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1977-1987.

Memo

通信作者:屈永超(1974-),男,河南登封人,工程师,E-mail:qyc0391@126.com