Design of “stress-seepage-damage” analysis width of section coal pillar Click Copy

Design of “stress-seepage-damage” analysis width of section coal pillar

References:

[1] Wilson A H.Pillar stability in log wall mining state of the art of ground control in longwall mining and mining subsidence[J].New York:Society of Mining Engineer,1982:77-88.
[2]侯朝炯,马念杰.煤层巷道两帮煤体应力和极限平衡区的探讨[J].煤炭学报,1989,4(3):21-29. HOU Chao-jiong,MA Nian-jie.Stress in in-seam roadway sides and limit equilibrium zone[J].Journal of China Coal Society,1989,4(3):21-29.
[3]白 矛,刘天泉.条带法开采中条带尺寸的研究[J].煤炭学报,1983,4(8):19-26. BAI Mao,LIU Tian-quan.Research on stripe size in strip-partial mining[J].Journal of China Coal Society,1983,4(8):19-26.
[4]吴立新,王金庄,郭增长.煤柱设计与监测基础[M].徐州:中国矿业大学出版社,2000. WU Li-xin,WANG Jin-zhuang,GUO Zeng-chang. Coal pillar design and monitoring basis[M].Xuzhou:China University of Mining and Technology Press,2000.
[5]王运生,吴俊峰,魏 鹏,等.四川盆地红层水岩作用岩石弱化时效性研究[J].岩石力学与工程学报,2009,28(S1):3 102-3 108. WANG Yun-sheng,WU Jun-feng,WEI Peng,et al.Research on time effect of rock weakening by water-rock interaction of redbeds in Sichuan basin[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(S1):3 102-3 108.
[6]龚钢延.水渗透引起的应力场调整及岩石强度弱化的初步研究[J].西北地震学报,1990,12(4):55-59. GONG Gang-yan.Preliminary study on stress field adjustment and rock strength weakening caused by water seeping[J].Northwestern Seismological Journal,1990,12(4):55-59.
[7]尹 健,吉廷宏.水对岩体结构面抗剪强度弱化作用分析[J].山西建筑,2009,35(5):115-116. YIN Jian,JI Ting-hong.The analysis of the shearing strength's weakening action of water on the rock's structure[J].Shanxi Architecture,2009,35(5):115-116.
[8]张科学,姜耀东,张正斌,等.大煤柱内沿空掘巷窄煤柱合理宽度的确定[J].采矿与安全工程学报,2014,31(2):255-262,269. ZHANG Ke-xue,JIANG Yao-dong,ZHANG Zheng-bin,et al.Determining the reasonable width of narrow pillar of roadway in gob entry driving in the large pillar[J].Journal of Mining and Safety Engineering,2014,31(2):255-262,269.
[9]王德超,李术才,王 琦,等.深部厚煤层综放沿空掘巷煤柱合理宽度试验研究[J].岩石力学与工程学报,2014,33(3):539-548. WANG De-chao,LI Shu-cai,WANG Qi,et al.Experimental study of reasonable coal pillar width in fully mechanized top coal caving face of deep thick coal seam[J].Chinese Journal of Rock Mechanics and Engineering,2014,33(3):539-548.
[10]周华龙,李开学,田卫东,等.数值模拟确定沿空掘巷合理煤柱宽度[J].煤矿开采,2010,15(1):23-25. ZHOU Hua-long,LI Kai-xue,TIAN Wei-dong,et al.Numerical simulation of rational width of coal pillar for roadway driven along gob[J].Coal Mining Technology,2010,15(1):23-25.
[11]朱若军,郑希红,徐乃忠.深井沿空掘巷小煤柱合理宽度留设数值模拟研究[J].地下空间与工程学报,2011,7(2):300-305,310. ZHU Ruo-jun,ZHENG Xi-hong,XU Nai-zhong.Study on the reasonable pillar width of road way driving along goaf in deep mine[J].Chinese Journal of Underground Space and Engineering,2011,7(2):300-305,310.
[12]屠洪盛,屠世浩,白庆升,等.急倾斜煤层工作面区段煤柱失稳机理及合理尺寸[J]中国矿业大学学报,2013,42(1):6-11. TU Hong-sheng,TU Shi-hao,BAI Qing-sheng,et al.Instability of a coal pillar section located at a steep mining face:Pillar size selection[J].Journal of China University of Mining and Technology,2013,42(1):6-11.

Memo

基金项目:国家重点基础研究计划(973计划)项目(2015CB251600); 国家自然科学基金(U1361206); 国家自然科学基金(51504184) 通讯作者:范公勤(1958-),男,陕西西安人,副教授,E-mail:643624041@qq.com