Numerical analysis of piles driving by high frequency vibration using discrete element method Click Copy

Numerical analysis of piles driving by high frequency vibration using discrete element method

References:

[1] 徐维钧.桩基施工手册[M].北京:人民交通出版社,2007.
XU Wei-jun.Pile foundation construction manual[M].Beijing:China Communications Press,2007.
[2] Barkand D D.Foundation engineering and drilling by vibration method[C]//Proc. 4th Int. London Conf. on Soil Mechanics and Foundation Engineering,1957(2):3-7.
[3] Heerema E P. Relationships between wall friction, displacement velocity and horizontal stress in clay and in sand for pile driveability analysis[J].Ground Engineering,1979(1):55-65.
[4] Holeyman A E.Soil behavior under vibratory driving[C]//In: Proceedings of the int.Belgiun:Conference on Vibratory Pile Driving and Deep Soil Compacition,2002.
[5] 陈龙珠,陈岱杰.高频振动沉桩特性的模型试验研究[C]//第七届全国土动力学学术会议论文集.北京:清华大学出版社,2006.
CHEN Long-zhu,CHEN Dai-jie.Model test research on high frequency vibratory pile driving[C]//The 7th Soil Dynamics Academic Conference Proceedings.Beijing:Tsinghua University Press,2006.
[6] 陈岱杰,陈龙珠,郑建国.高频振动打桩机理的试验研究[J].铁道建筑,2006(7):49-51.
CHEN Dai-jie,CHEN Long-zhu,ZHENG Jian-guo.Test research of the mechanism of high frequency vibratory pile driving[J].Railway Engineering,2006(7):49-51.
[7] 郑添寿,陈福全.高频液压振动锤打桩有限元方法分析[J].福建建设科技,2008(6):6-12.
ZHENG Tian-shou,CHEN Fu-quan.Finite element analysis of vibratory pile driving using the high frequency hydraulic vibratory hammer[J].Fujian Construction Science and Technology,2008(6):6-12.
[8] 陈福全,雷金山,汪金卫.高频液压振动锤沉桩的打入性状分析[J].铁道科学与工程学报,2009,6(1):41-47.
CHEN Fu-quan,LEI Jin-shan,WANG Jin-wei.Penetration behavior due to vibratory pile driving using the high frequency hydraulic vibratory hammer[J].Journal of Railway Science and Engineering,2009,6(1):41-47.
[9] 罗 勇.土工问题的颗粒流数值模拟及应用研究[D].浙江:浙江大学,2007.
LUO Yong.Simulation of soil mechanical behaviors using discrete element method on particle flow code and its application[D].Zhejiang:Zhejiang University,2007.
[10]Masoumi H R,Degrande G,Lombaert G.Prediction of free field vibrations due to pile driving using a dynamic soil-structure interaction formulation[J].Soil Dynamics and Earthquake Engineering,2006:1-18.
[11]陈福全,汪金卫,李大勇.高频液压振动锤打桩的应用概况与研究进展[J].岩土工程学报,2011, 33(增刊2):224-231.
CHEN Fu-quan,WANG Jin-wei,LI Da-yong.Application and advance of vibratory driving techniques using high-frequency hydraulic vibratory hammer[J].Chinese Journal of Geotechnical Engineering,2011,33(suppl.2):224-231.
[12]中国振动工程学会土动力学专业委员会.土动力学工程应用实例与分析[M].北京:中国建筑工业出版社,1998.
Soil Dynamics Professional Committee in China Vibration Engineering Institute.Application examples and analysis of soil dynamics engineering[M].Beijing:China Architecture and Building Press,1998.
[13]王学红.高频液压振动锤沉桩机理的颗粒离散元模拟[D].福州:福州大学,2010.
WANG Xue-hong.Discrete element modeling of mechanisms of high frequency hydraulic vibratory pile driving[D].Fuzhou: Fuzhou University,2010.

Memo

收稿日期:2012-06-10
基金项目:教育部新世纪优秀人才支持计划资助项目(NCET-07-0519); 山东省自然科学基金项目(ZR2009FM071); 山东科技大学研究生科技创新基金项目(YCA110324)
通讯作者:乔卫国(1963-),男,山东荣成人,教授,博导,主要从事岩土加固理论与应用技术的教学、科研工作.