Risk assessment of Xi'an metro line 1 special sections construction Click Copy

Risk assessment of Xi'an metro line 1 special sections construction

References:

[1] Einstein H H.Risk and risk analysis in rock engineering[J].Tunneling and Undegrorund Space Technology,1996,11(5):141.
[2] Soren Degn Eskesen, Per Tengborg, Jorgen Kampmann, et al. Guidelines for tunneling risk management[J].Tunnelling and Underground Space Technology, 2004,19(3):217-237.
[3] Sturk Olsson Johansson.Risk and decision analysis for large underground projects,as applied to the Stockholm ring road tunnels[J]. Tunneling and Underground Space Technology,1996,11(2):157-164.
[4] 黄宏伟.隧道及地下工程建设中风险管理研究进展[J].地下空间与工程学报,2006,2(1):13-20.
HUANG Hong-wei.State-of-the-art of the research on risk management in construction of tunnel and underground works[J]. Chinese Journal of Underground Space and Engineering, 2006,2(1):13-20.
[5] 王梦恕.厦门海底隧道设计施工运营安全风险分析[J].施工技术,2005,(S1):1-5.
WANG Meng-shu.Design,construction and operation safety risk analysis of the Xiamen submarine[J].Tunnel Construction Technology,2005,(S1):1-5.
[6] 陈 龙,黄宏伟.软土盾构隧道施工期风险损失分析[J].地下空间与工程学报,2006,2(1):74-78.
CHEN Long,HUANG Hong-wei. Risk loss analysis during construction of soft soil shield tunnel[J]. Chinese Journal of Underground Space and Engineering,2006,2(1):74-78.

Memo

基金项目: 教育部博士点基金项目(20070704001); 陕西省自然科学基金项目(2007D14) 通讯作者: 杨更社(1962-),男,陕西武功人,教授,博导,主要从事岩土力学与工程的教学科研工作.